0:00:09 City Clerk Marci Patterson [?]
Mayor Padden, it's 6 o'clock when you're ready. Thank you very much.
0:00:13 Mayor Laura Padden
So the Spokane Valley City Council regular meeting, formal format B, for Tuesday, July 21st, 2026, is now called to order. We do not have an invocation tonight, so if you'd like to stand and we can say the pledge. [unclear]
0:00:34 Unidentified speaker A
pledge allegiance to the flag of the United States of America, and to the republic for which it stands, one nation, our God, and the [unclear] liberty, and justice for all.
0:00:52 Mayor Laura Padden
If the clerk would call the roll, please. Certainly.
0:00:55 City Clerk Marci Patterson [?]
Mayor Patton? Here. Deputy Mayor Hattenburg? Here. Councilmember Haley? Here. Councilmember Yeager? Here. Councilmember Wick? Here. And I have an absent Council Member Kelly and Council Member Merkel. Second.
0:01:12 Mayor Laura Padden
All those in favor? Aye. Opposed? They are excused. Thank you.
0:01:21 Unidentified speaker B [earlier-pass label: Laura Padden; unconfirmed]
We have the approval of an amended agenda. Move to approve of the amended agenda. Second. All those in favor? Aye.
0:01:29 Mayor Laura Padden
Opposed? It is approved. There are no special guests or presentations, no proclamations. So that brings us to the general public comment opportunity. This is an opportunity for the public to speak on any subject except agenda action items, as public comments will be taken on those items where indicated. Please keep comments to matters within the jurisdiction of the city government. This is not an opportunity for questions or discussion. Diverse points of view are welcome, but please keep remarks civil. Remarks will be limited to three minutes per person. If a person engages in disruptive behavior or makes individual personal attacks regarding matters unrelated to city business, then the council and or mayor may end that person's public comment time before the three minute mark. Is there anyone on
0:02:23 City Clerk Marci Patterson [?]
Zoom? There is not this evening.
0:02:33 Unidentified speaker [?]
Thank you. [unclear] you.
0:02:36 Mayor Laura Padden
We have Preston Bone first.
0:02:46 Public commenter: Preston Bone (name as heard)
Good evening council. My name is Preston Bone. I'm a resident here in Spokane Valley. I'd like to speak today on Flock cameras and the importance of limiting all ALPR cameras in this city. These cameras, which are installed everywhere in Spokane Valley, track all vehicles and their drivers around the clock. Flock comes with promises of safety, security, and transparency, but each one of these promises are false and empty. First, safety alpr cameras became popular with the promise of catching more criminals however cynthia lum in the journal of experimental criminology found that all alprs quote do not generate either a general or offense specific deterrent effect jonathan hofer from the independent found that quote there is not even a moderate degree of correlation between alprs and stolen vehicle recoveries. Flock's promise of safety and protection is unsubstantiated and their cameras have no effect on this valley's safety. Second, security. Flock claims that their cameras will only be used by the right people for the right things. In truth, Flock's database is so easy to hack that security researchers found Flock logins and live streams available for sale on Russian forums. Even from approved parties, misuse is common. There are currently 18 cases of police officers using FLOC specifically to stalk ex-partners, with one Kansas police chief tracking their ex-girlfriend 164 times over four months. In Georgia, a police officer accepted bribes to track a woman's license plate for an outside party. Authorized or not, there are many parties who can abuse these systems for personal gain. Third, transparency. Flock claims that these cameras are only for static license plate pictures. However, they are capable of video, audio, and personnel profiling based on race, age, and gender. They also have a history of lying to local governments about their contracts. In California, Flock enabled a nationwide setting for sharing the city's data without police knowledge. In Texas, Flock made 147 unilateral changes to their contract, including the deletion of the phrase, Flock does not own and shall not share and shall not sell customer data, getting rid of their city contract line completely. Flock cameras are not safe, secure, or transparent. They know where we are at every minute of every day and provide nothing in return to the citizens of this city. I urge this council to join the 90 cities who have stood up to this wave of ALPRs by deactivating cameras or canceling contracts. This page will be given to each of you. It is the script as well as the evidence for every claim I've made today. Thank you for your time. Thank you.
0:05:54 Mayor Laura Padden
And next we have John Harding.
0:06:10 Public commenter: John Harding (name as heard)
John Harding, Spokane Valley. I want to support the previous gentleman's statement. I concur with everything you said. It's not rocket science. Anything electronic can be hacked. We don't know where this information is going. And anybody who says they do, I want to hear from them. I want to know where this information is going. Second tonight, I want to talk about voter integrity. It's been a hot topic here recently. The president tried to inform the public, and only two media sites would even put him on. That should be a little red flag. It is to me. The media didn't want anybody to know about this, but nation-states have been involved in hacking our information for votes. And it wasn't just China. There are many nations involved in hacking our elections. Anything electronic can be sent anywhere in the world, okay? So I'm here tonight regarding the concern about the lack of integrity in our voter system. According to the recent Gallup poll, the United States has only one or two nations that are considered worse than the United States as far as their citizens believing in their voting system as being safe. The Pew Research Center states that at least 24 million voters were illegally registered. 2.75 million are registered in multiple states. 1.8 million are dead. There were 460-some counties that had more registered votes than people that were allowed to vote in their county. 465 counties. And yet people are saying, well, gee, I mean, nothing wrong with that. I mean, do the math. A sophomore in high school would tell you there's something wrong here, folks. So we have something called the Voter Integrity Law. It was in 1993. Requires all secretaries of state to clean their roles once a year. The Secretary of State of Washington refuses to do that at this point in time. So I'm hoping that I can get your support to notify our Secretary of State that he should comply with the 1993 law and give us, at least as voters, the chance to vote for the people that we vote for and know that they're going to get, my vote is going to be counted as I vote it. No machines. I remember, I'm sure you folks all remember, when we used to go to our local precinct, a church or a school, and we would meet folks there, and we would use a pen or a pencil and write it on paper. And the next day, we knew who won the election. Now, why does it take three weeks? [P1: with these] electronic machines what do you think's going on again folks this is not rocket science and if we can't trust our vote then as a nation we're in trouble thank you for your time thank you very much is there anyone else who'd like to comment anyone
0:09:25 Mayor Laura Padden
else seeing none I'll close the first general public comment and move on to our action items. Madam Mayor?
0:09:35 Councilmember Ben Wick
City Manager has a call. Oh, sorry.
0:09:37 City Manager John Hohman
County Manager? I just wanted to make a comment on the public testimony you heard, especially regarding the flat cameras. So the flat cameras have been deactivated by the order of the Spokane County Sheriff as of the end of March of this year, and they have not been in use. And then earlier today, Police Chief Dave Ellis notified the Public Safety Committee that the county has been released from their contract with Flock. So I just wanted to provide the community with an update on that.
0:10:13 Mayor Laura Padden
[unclear] you appreciate that so the action items adopting the master parking prohibition schedule
0:10:25 City Clerk Marci Patterson [?] [attribution disputed across passes]
move to approve resolution resolution number 26 [unclear] 1 2 adopting the master parking prohibitions schedule second the agenda item title is resolution number 26 [unclear] 2 adopting the master parking prohibition schedule with [unclear] Clark.
0:10:45 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Good evening, Madam Mayor, members of council. I'm here back before you tonight to discuss and present the master parking prohibition schedule. As a reminder, I did not include the PowerPoint presentation this time. So we went over that before. This is a point in time baseline of what is currently signed as a no parking area in the city of Spokane Valley. This was established through the code in 2022 that identified there will be a maintained master parking prohibition [unclear] schedule. Lots of data was collected to get where all of our signs were and assigned to certain sections of the roadways and those are before you now. I've included a summary, a draft summary with the packet that has a few changes that were made since last time I was here. Those are reflective of working with our GIS staff to get those into a mapping format. Identified a few areas need to be updated based on where some signs were and I've also included the resolution with the actual code language and I'm happy to answer any questions questions from council seeing
0:11:52 Mayor Laura Padden [attribution disputed across passes]
none this is also a public comment item so are there any comments from the public anybody on zoom no mayor anybody out in the public there okay seeing none we'll close the public comment comments from council councilmember wick I just appreciate you taking the time to go through and do a full city scan to really get an inventory of what
0:12:19 Councilmember Ben Wick
signs are out there so very thorough and appreciate you setting up a good schedule for us to move forward with
0:12:27 Mayor Laura Padden
okay all those in favor aye it is unanimous thank you the
0:12:36 Deputy Mayor Tim Hattenburg
next item is a TIB grant application move to authorize the city manager or designee to submit 2026 TIB applications for the projects listed in table 1 second the
0:12:50 Mayor Laura Padden [attribution disputed across passes]
agenda item title is motion consideration potential grant opportunity transportation improvement board tib and we have adam jackson and kristen armstrong good evening mayor and members of council as you stated we're here tonight to present the motion consideration for the tib
0:13:10 Senior Engineer Kristen Armstrong [attribution disputed across passes]
applications for the 2026 application period as we discussed on june 30th For our administrative report, we are pursuing two applications, one for Pines Road from 32nd to 40th and another on Barker Road from Sprague Avenue to the South City Limits around 8th. We will be applying to two different application categories within TIB. One is the UAP category, where the typical application is about $1 to $3 million, and we are competing for about $7 million within our region. We're also applying to the Complete Streets category, where there is $40 million available statewide, and the applications tend to range from about $25,000 to $3 million. In both of our application cases, we are looking to apply for less than a million dollars. After consulting with TIB staff, we found that this is a competitive price range for our projects. In addition, our projects matches of the 80-20%, 80% grant, 20% local match, they meet up well with that requirement and place us at that approximate less than $1 million application. So that's a little bit of background on the program that we're applying for. Specifically, we did consider one more application for this cycle, and that was for the Sullivan-Trent Interchange Project, where we were recently awarded the approximate $21 million build grant, and we will be needing an additional approximate $10 million [unclear] in non-federal match funds. We will be looking to the TIB program in the future as a portion of that match as we go forward. We did a study of the project as a whole and when construction will take place and looked at when we would actually be spending these non-federal match dollars and found that it will not occur during this 2026 application period [unclear] would need to be ready to spend them sooner than we will be so we decided at this point not to apply for the funds this application cycle but they did encourage us to apply for them in the next cycle So with that, it would be our recommendation that we would apply for, for the Pines Project, $880,000 for that project. These funds would replace local funds that are already budgeted for this construction project. So if awarded, these grant funds would replace the local funds that are planned. And similarly, for the Barker Road project, we have already received numerous grants for the project between Sprague and 8th. This would be a grant amount in the amount of $897,000 that would again replace local funds that are already planned for construction.
0:16:52 Mayor Laura Padden
Questions from Council? Seeing none. Again, it's an opportunity for public comment. [unclear] there any public comment anyone wants to come up and say something no one on zoom all right anybody in the audience seeing none we'll close public comment
0:17:13 Councilmember Ben Wick
comments from council councilmember wick just again two great projects really appreciate you bringing these forward there I'm really keeping my fingers crossed for Barker Road because kid that would be a huge milestone victory for us [unclear] that whole kind of corridor completed and also as a person that reviews grant programs i really appreciate you looking at the timing of the funds because that's a lot of pressure right now across the state to make sure you deliver in the time frame that you're you're asking for and a vast majority of jurisdictions across our state do not pay attention to that so i really appreciate that as well deputy mayor yeah i just want to concur
0:17:54 Deputy Mayor Tim Hattenburg
with councilmember WIC, I also wanted to add in the Barker Road Project, if you haven't or are not familiar, I'm sure most of you are, if not all of us in the room, once you go south from 8th, you're in the county, and there's a development at Ridgemont, I believe it is, and that is very, that traffic is backed up, and so if you just drive there through once, you'll see why it's needed, so it's great that this is on there, so thank you.
0:18:19 Mayor Laura Padden
All right, all in favor? Aye. Opposed? It is unanimous. Thank you very much. Thank you.
0:18:37 Deputy Mayor Tim Hattenburg [attribution disputed across passes]
Next, we have a motion consideration for Arterial School Crossing Bid Award. Move to award the Arterial Schools Crossing Project to Homie Construction, Inc. in the amount of $1,239,505.49 and authorize the city manager to finalize and execute the construction contract. Second.
0:18:56 Mayor Laura Padden
With Rob Lockmiller.
0:18:58 City Clerk Marci Patterson [?]
The agenda item title for this is Bid Award for the Arterial Schools Crossing, CIP number 380.
0:19:06 Mayor Laura Padden
Okay, now Rob.
0:19:09 Rob Lochmiller (Engineer) [name read from caption]
Good evening, Mayor, Council Members. Rob Lockmiller, Engineering Manager. Tonight's motion's consideration is the Bid Award for the Arterial Schools Crossing. This project will construct or improve existing pedestrian crossings at 10 locations on arterial streets by several nearby schools. City solicited bids on June 17th and opened bids on July 1st. We received one bid. The lowest responsive and [unclear] and responsible bidder is Homie Construction with a bid of $1,239,505.49. So it's approximately 21% more than an engineer's estimate. The project bid tabulation is provided in the council package. In order to cover an additional cost, the city requested and received an increase of $520,000 from WSDOT's [unclear] Rail to School program, bringing the grant total to $1,712,000. As a result, there are sufficient funds to cover the cost for this construction Construction contract and city staff is recommending award But that'll be happy to answer any questions with the bid questions from council councilmember wick
0:20:25 Councilmember Ben Wick
So I thought I remember us having a conversation around speed feedback signs Wasn't that this program that we were doing so?
0:20:35 Rob Lochmiller (Engineer) [name read from caption]
This project does have two speed limits of signs on 32nd
0:20:42 Councilmember Ben Wick [attribution disputed across passes]
[unclear] we didn't do them at all the schools then or just at that location just at that location at ui how did we get to that i don't remember because i thought we were talking about trying to incorporate the feedback signs in in most of them
0:21:11 Engineering Manager Adam Jackson [attribution disputed across passes]
[unclear] program requested an interview on that project and requesting an interview is a great sign that your project didn't get cut so here in the next month we'll be interviewing with the DOT program for that project, which is 27 school locations citywide that has speed feedback signs, RFB crossings, and school zone flashing beacons, a hodgepodge from location to location, a unique combination at each spot. So that's pending still. Different from this, but very similar.
0:21:52 Councilmember Ben Wick
Go ahead. So if that's different schools, how much would it be for us [unclear] mean if we already have a contractor there doing the work for the flashing beacons how much more would it be to add the speed feedback signs then specific to this scope and this contract i can't speak to it um i would like us to have that conversation sure if we can not trying to hold this up but it's
0:22:16 Engineering Manager Adam Jackson [attribution disputed across passes]
a golden opportunity we already have a contractor they're working at these schools yes to be able to add those speed feedbacks we can check to see what that scope included on the second call versus this one [unclear] or this one may already have them i guess i'd need to double check with what exists today okay thank you thanks rob city manager and we can look
0:22:36 City Manager John Hohman
into that and work with council it may be that we can cover the cost of installation under the contingency but we can look at that and let you know i
0:22:49 Councilmember Ben Wick
would appreciate that [unclear] okay
0:22:53 Mayor Laura Padden
this also is open for public comment so no zoom okay anyone in the audience wish to comment seeing none we'll close public comment council comments okay all those in favor opposed it is unanimous we
0:23:26 Deputy Mayor Tim Hattenburg
now have another motion consideration for a federal local bridge program grant [unclear] Move to authorize the city manager or designee to apply for up to $800,000 for the federal local bridge program preservation grant. Second.
0:23:41 City Clerk Marci Patterson [?]
The agenda item title is Potential Grant Opportunity Federal Local Bridge Program.
0:23:47 Mayor Laura Padden
With Robert Blagan.
0:23:50 Public Works Director Robert Blegen [attribution disputed across passes]
Good evening, Mayor Patton, Council Members. Robert Blagan, Public Works Director. As discussed last week, the DOT is anticipating an opportunity for a federal grant funding becoming available through what is called the federal local bridge program staff has identified three preventative maintenance projects that could compete well in this category the Fancher bridge over BNSF [unclear] over BNSF and Barker over the Spokane River the proposed project would be bundled into one so all three into one and the request is to fund application of a penetrating surface sealer to the bridge decks to better protect them from moisture and chlorides to extend the bridge deck life applications are due August 7th and I can take any questions
0:24:43 Councilmember Jessica Yaeger
questions from council council member Yeager thank you so you've talked about micro cracking before because one of these bridges is newer quite newer so is Is there anything to say that maybe we should do this when the bridge is first built and built in that cost to some of it or do we have to wait for it to crack?
0:25:07 Public Works Director Robert Blegen [attribution disputed across passes]
[unclear] that's a great question council member Yeager there is difference of opinions on those generally the application of these sealers is done down the line when you're doing a crack sealer so that the cracks form and can penetrate there are other applications that some states do immediately after construction that's a surface sealer like an epoxy deck Montana does some of those applications and the objective of that investment is to seal it on the surface immediately after the bridge deck is poured other states will do watch to see how the deck goes and ones that have less micro cracking maybe don't get sealed and the ones that do they try to do a crack application okay thank you [unclear]
0:25:59 Mayor Laura Padden
questions seeing none again this is open to public comment no zoom anybody in the in the public here would like to come up and comment seeing none I will close public comment comments from council councilmember wick
0:26:20 Councilmember Ben Wick
I just appreciate that we have a bridge program now so I know your leadership brought that forward and kind of got this going for our focus on bridges there's so many dilapidated bridges across our states anything that we can do to keep preserving our our bridges is greatly appreciated.
0:26:40 Mayor Laura Padden
Other comments? All those in favor? Aye. Opposed? It is unanimous. Thank you.
0:26:52 Mayor Laura Padden
And we do have another consideration,
0:26:56 Deputy Mayor Tim Hattenburg
a mayoral appointment of additional alternate for Homeless and Housing Task Force. I move to confirm the mayoral appointment of Jessica Yaeger as a second alternate for position one. [P1: to] the Homeless and Housing Task Force. Enthusiastically second.
0:27:16 City Clerk Marci Patterson
And I apologize, I don't have the title because I don't have that document in front of me. It's not in my packet. So you all got one. I did not get one. My apologies. Well, we can go forward to Gloria Mantz. All right. Good evening, Council. Mayor Gloria Mantz, City Service and Administrator.
0:27:33 City Services Administrator Gloria Mantz [attribution disputed across passes]
The Homeless and Housing Task Force has nine voting members. The first position is assigned to a city council member representative, and Councilwoman Haley serves in that position. The alternate is Deputy Mayor Hardenberg, and from time to time, they have conflicting schedules, and they cannot attend these meetings. So for this reason, [unclear] would like to appoint a second alternate for this position one for Councilwoman [unclear] to serve. And I'll be happy to answer any questions you may have any questions from council saying none again this is open for public comment any public comment anyone
0:28:14 Mayor Laura Padden
out there want to ask a question saying none we'll close public comment comments from council all right All those in favor? Aye. Opposed? It is unanimous. Thank you, Gloria.
0:28:36 Mayor Laura Padden
This brings us to our non-action items and admin reports. The first is a citywide impact fees discussion with Jeremy Clark.
0:28:49 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Good evening again, Madam Mayor, members of Council. I am here again this evening to talk about impact fees, citywide impact fees.
0:28:59 City Clerk Marci Patterson [?]
I won't go through a brief reminder because we'll touch it all again in the PowerPoint. [unclear] Hey, Jeremy, would you mind pulling your mic just a smidge closer? Thank you very much.
0:29:09 Unidentified speaker [?]
I'll stay as close as I can. Thank you.
0:29:14 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
There's the agenda. I won't bother reading it. It's very clear. So we'll start off with what the transportation impact fee is. It's a one-time charge paid by development as new development comes in, and that cost goes towards projects that are needed to maintain the system, to maintain the capacity and level of service of that system. So new development pays for the new capacity that's required for that development. It was authorized by the Growth Management Act, and one caveat that's in there is it cannot just be collected and stored. Money has to be spent within a certain time frame, such as 10 years. If that money is not spent, legally it has to be returned. If it's not spent because the city didn't use it, it must be returned with interest.
0:29:57 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Right now we have a program, and so what is the need to update that program? And really, that is to reflect the current needs and the future growth that we have across the city. Right now, we have the three zones, the South Barker Corridor, the Mirabu sub area, and the North Pines Road sub area. [unclear] there are more projects that are just in those locations those locations were established as we'll go over a little bit based on where studies were completed for those corridors what projects were needed specific to high growth areas and as the as the program has been in place we've seen the benefits we've seen some other requests for having more consistency across the city additionally the growth is increasing so how can we maintain our roadway system efficiently and consistently throughout the city and then make it as easy for traffic mitigation for development as we can compared to our current system. So as some background to our current system, kind of a three-tiered approach, it makes perfect sense to me because I have to do it every day. It's very hard to understand as you're trying to explain it to certain sizes of developments. If there are expected to be less than 10 trips growing through the system, then they can just submit a simple letter saying what they expect. Most of the time, if they're going to be going through an area that has a known deficiency, then it gets more complicated than that. They have to go through a trip generation distribution letter. If there are more than 10 trips, everyone does a trip generation and distribution letter. And then after they tell us where they think the trips are going, then if more than 20 trips go through an intersection of arterial streets, then additional [unclear] traffic impact analysis is required for anything within a certain limit or distance of that development. From here, then we determine whether or not there's a failure. If there's a failure, then mitigation has to occur. If there's not a failure, all that analysis was completed just to verify there's not a failure. This has costs for staff. This has costs for development, both for them in time waiting for this development to be approved, also for the costs of analysis the impact view program still has costs there is the cost per trip but it's a more consistent and known cost extreme time savings on both sides of the table how does it work so a list of projects is developed from those what type of project are are allowed or depends on if its capacity and that can include pedestrian bicycle capacity vehicle capacity if it's more of a safety project or just a strictly maintenance project that is not eligible for impact fees. If it's not due to new growth, it's not eligible for impact fees. If it's an existing failure and there's also additional need for new growth, the existing deficiency has to be pulled out. How much it would cost to improve that now is not eligible for impact fees. From there, anything growing inside the city, eligible for impact fees. So is it development occurring inside the city that brings those trips that's eligible if an external growth is creating that that's a separate process than our transportation impact fees in the city from there we estimate total trip growth through the city we estimate total project cost to implement all of these projects and then it comes down to a cost per trip that's how it's assigned to development through the city this is done for a pm peak hour uh an easy way to explain that is that is the the worst hour of the day for traffic. That is when we look at to make sure does our system fail or does our system work? And our current level of service requirements specifically reference the PM peak hour. And so that's how every trip that we evaluate is based on that hour of the day and how we're going to make sure the system works during that hour. Current program. So back in 2020, we adopted the first section of code and the first area in South Barker. The following year, the Mirabu and North pines areas were established the year after that the entire system was updated based on a change in trip rates so we use something called the ite trip generation manual it's a empirical basis of data for across the country for where they count different entities count lots of different developments housing retail commercial and and i find out how many trips go to and from those locations daily and by the hours and then publish that information and that is our basis as adopted in the code. That was updated in 2022, so all of our trip fees were updated in 2022. Since inception, so since the debarker code was done in December, really for our first year was 2021, there's been approximately $2 million in impact fees paid since then, and those are strictly impact fees, not developer mitigation or PAO fees.
0:34:48 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
The approach to updating our program is really to simplify it. Right now, the limits of those projects that are out here in existing areas, they are not contiguous, except for the North Pines and a very defined line. If you're in the South Barker corridor impact fee area, you could be on one side of flora or the other and not really be sure whether or not you're going to have to pay an impact fee. [unclear] one side you will and the other side you won't and that's very hard to understand very hard to explain but as this area was developed it was based on where is the the impetus where where's the biggest impact to that corridor where do you draw the line and it's based on transportation analysis zones and the regional travel demand model that defines where the lines are and so that's how this was set up so this program would make it more simplified and based on zones so we We would still have certain areas, but they would be separated based on where the growth is going to occur. That has an impact on the trip rates, where the project is going to be. That has an impact on the trip rates, and that is the approach. I was here before, whenever that was. I think it was last year. I'm pretty sure it was last year. I didn't look at the date. And the initial analysis that we had completed based on the travel demand modeling, it was set up into three separate zones across the city, took feedback, laid out those zones a little differently, to be more geometrically equal, spread out, trying to get the trip growth as similar as possible by having similar geographic sizes. Here's the four zones that are proposed in the north, south, east, and west layout, and the total trip growth expected in these zones through 2050. And that number should say 2022 through 2050, because that is the time frame of the regional travel demand model and the land growth between that time frame. As you'll notice here, the highest amount of trip growth occurs in the eastern zone. That will come into reference a little bit later, but that's where there's the most developable land. That is where most of the trip growth will occur. So we start with projects. Staff compiled a list, basically a master list of all the projects. Our comprehensive plan 20-year list, our transportation improvement plan for the six years, all of the sub-area studies that have been completed over the last decade that identify location-specific improvements that are needed. We also looked at those areas of development that have tripped failure, so intersections like 8th and Carnahan, like Sprague and Pines, those types of intersections that are now collecting mitigation on a site-specific basis, added those to the list and started with that and started getting estimates and project estimates. Now, there are several locations, several projects included that are beyond just site-specific improvement projects. Those include elements to build out our arterial streets. So there's a certain dollar amount per year estimated over a 20-year horizon to complete sections of sidewalk. Right now, most of our sidewalk is built by development as it occurs with their frontage improvements. This provides an opportunity to increase that capacity of that segment of roadway and fill in a missing piece of sidewalk where developers have done the rest. So those types of costs are built into this system. Also elements such as providing a match or a portion of funding for crossings or other pedestrian-related projects like the school crossing project that Rob just came and talked about were added to the list because those types of project were relatively recently added on to where it wasn't just vehicular capacity that was eligible for impact fees [unclear] there they were divided into priorities so which ones do we know are going to be needed the most in the next short term and which ones are projects we would more like to have and they're more of a long-term project that should be built as the limit continues to occur an example of a tier one project project would be barker where things are already failing overall project costs in today's dollars on this list are estimated about $264 million. That's a pretty big chunk of change, as you will. But the important thing to note about impact fees is they must be fiscally constrained. So a city must reasonably show that they would have the money over time to fund these projects. We can't just come up with a list of all the projects that we want to build that would be nice to have one day and have development pay for that. We have to show that without impact fees, these projects could reasonably still be funded. So we went back working with Adam Jackson and identified all of the funds that have been spent on CFP projects, not including pavement preservation by city dollars and also by grant dollars. And what we found, and here's a picture of that chart. This was done about a year or two ago. If we do a trend line, so a couple of different ways, if we just do a trend line and see where that fund, where those funds have grown over the last 12 year period, how much would that accrue over the 20 years in the future? Or what if we just take the average? And so if we take the average money or average dollars that were spent, we're looking at about $310 million over a 20-year horizon. If we see growth, if we expect that trend line to continue up as it's been going for the last decade, if it's only a 10 year horizon, we're looking at about $250 million. If it's for a full 20 years, we're over $500 million of expected expenditures in projects. based on historical trends. So what this tells us is that based on a 20-year horizon, it is fiscally feasible that the city would build all of these projects with our funding that had been spent. And so that kind of opens up, we expected to go through this and see that we didn't have enough money, and we're going to narrow that list down. And so we started looking at, well, what do we do? So you can do all the projects, every project in the list. As you'll see in a slide or two, that ends up being a very expensive development impact fee because that's a lot of dollars that need to be spent. But it's legally allowed. We could legally charge that amount. Another option we looked at was only taking tier one. We're missing a one there in option two. Only take tier one and tier two, so the highest priority projects. And what that does is it lowers the cost, not as much as we would have liked because maybe we had a few too many projects in those higher tiers because they're all pretty important. But it limits where you can spend those dollars. So when you take away projects from the impact fee list, those dollars that come in cannot be spent on a project that's not in the list. So if something else changes down the road and we didn't have time to update it and this other project is a priority that's not on a list, those dollars cannot be sent there. So that's where we came up with option three. And so you include all the projects in the list. [unclear] it gives you the most flexibility but you reduce the amount significantly of what development would pay so right now development only pays or with everything that's fully allowed development pays for new trip growth so only the new part of that facility that needs to be needs This reduces that even further by trying to keep it affordable for development as it goes through the city. So that's where option three comes in. But it keeps all the projects there that could receive impact fee funding. As I mentioned before, option one has a very high cost. So if we were to charge development, the absolute maximum that we were allowed to charge development, [unclear] that were like a development project in the western region, because there's lower trip growth in the western region of the city, those would be extremely expensive development impact fees, close to $20,000. That's not, in my opinion, that's not a very palatable amount to charge to development, even though the city needs to build these projects to maintain capacity and level of service. Option two, as I mentioned, is not much lower because there are quite a few priority projects in those, [unclear] those top two, those are the expensive projects. Looking at option three, that brings it down much closer to what our existing impact fees are. Some of them are lower, some of them are higher, but that's a look at how those three different options are laid out.
0:43:04 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Here's another way to look at that data. So the top portion is the part that we have projected. projected forward of expected grants that we would receive. This is also roughly equal to what the city's responsibility would be. So in option one, it basically comes down to the city chasing grants to have the match for these portions and also development impact fees, I guess, chasing down grants and then impact fees to cover the rest and the grant match based on what our projected spending would be over that horizon. Option two, you can see the red portion there is what the city's additional costs would be beyond just grant alone. And if you recall, we had already expected to be spending this amount of money. And so it starts getting into where the city was expecting to spend on capital projects. Option three shows a much larger red section, a smaller gray section that would be development impact fee funded. But this still falls within the range of that chart that I showed earlier of what the city would be expected to budget over the next 20 years to pay for these projects.
0:44:16 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Here's this same information in a tabular format instead of a set of pictures. So this increases, assuming we have the same amount of grant funding and that grant is what the city would be pursuing, how does that play out with what city funds are attributed and what impact fee funds, who pays which share? And basically, it's flips option two and three.
0:44:38 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
And another summary of these three options. So option one, as you recall, is what we're allowed to charge. And I say allowed, and I emphasize that because it's what we've shown to be fiscally constrained, but it's just a very high amount that isn't really reasonable to charge the development. Option three is the most flexible because you can apply those TIF funds to anything on that project list and gives the city the most flexibility to pursue grant funds and supplement that list. And then both options two and three would require more than option one as far as what base city funds are used. And so the city will still be providing their own funds to supplement these projects, and that's important to note.
0:45:22 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Some milestones of where we've been. So I came here, I guess it was May of last year, and started this conversation. But generally, we've been going through this process for a few years, ever since the regional travel demand model was updated and released, and we have our own city-specific sub-area model. We've gone through the process so far. today we are discussing those fee scenarios and as if we move forward then that would go towards finalizing that rate study based on the selected option identifying the cost per trip for each type of land use and then that would be then incorporated into the master fee schedule is how our code was set up with that i am recommending our staff recommends moving forward with option three for all the reasons that we already discussed during the course of the presentation and I'm happy to address any questions.
0:46:12 Mayor Laura Padden
Questions from Council? Council Member Yeager.
0:46:17 Councilmember Jessica Yaeger
Thank you. So, Jeremy, if someone is doing a development, say, in the east side, are we still then able to use these funds on the west side? Are they segregated based on where that money is drawn from?
0:46:34 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
They are not. Very good question. And so it's through the calculation process, every single project in this model, this traffic model, so we know the locations of these projects, we know where the roads are, and there's a way to estimate how trips are broken out through the network. And so every single project is pulling trips from different areas of the city. A project in the west zone may only have 10% of its trips coming from the east zone, but still 10% of those east zone fees are going towards that west zone project. So any project that's in the area has a contribution from another portion of the city. Thank you.
0:47:12 Mayor Laura Padden
Council Member Wick.
0:47:14 Councilmember Ben Wick
So a couple questions. One, you said it was based on trip growth. How does that relate to the GMA and kind of the population estimates and growth estimates that GMA uses?
0:47:27 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Good question. I think I understand the questions. [unclear] from gma there's a limitation on through from the county-wide land use growth on what can be expected and that's broken down into each city and basically defines what can be expected to grow how much can land use be expected to grow in different regions of the county and that's allocated and so that this matches with what was allocated to spokane valley for land use growth So that as that land use grows, those are the exact trips that are calculated from that land use growth. [unclear] Go ahead.
0:48:04 Councilmember Ben Wick
On another, thank you for that clarification. So just for clarification, so this is not just looking at residential development. This would apply to industrial development, commercial development, any kind of development. Correct. So if somebody had a, let's say, an ADU where they converted their garage over to another housing unit, that would be another trip then. So on top of their permits and their fees, they would have an impact fee for creating another residential unit as well? Yes, but there are caveats
0:48:40 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
that were added within the last two years. There are limitations on what impact fees can be charged and how those must be downgraded based on certain types of developments. If I remember correctly, and I can come back and follow up if I had an incorrect memory, ADUs can only be no more than half of the primary unit as far as trip growth, but it would still be an additional portion of a trip or additional cost that would go towards that unit, correct? Thanks.
0:49:11 Deputy Mayor Tim Hattenburg
Deputy Mayor. Jeremy, just to be clear on the minimize the financial impact, I think that's very important. So would that give us the ability because of that, would that allow us to be more competitive in bid awards for projects with the idea of knowing the development that's going to be taking place? It's not going to be too costly or for the developers themselves.
0:49:34 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
I don't know if that would make us more competitive in the bid awards. It would make us more, in my opinion, it would make the city more ready to contribute, more ready to move forward with those projects and have them ready to go.
0:49:48 Mayor Laura Padden
So also some of the, a couple benefits of this zoning is you had mentioned boundary effects before, that a developer may build, say, in the East and not pay as much in fees as they would if they built in the West, right? Correct. Kind of an unfair, well, I wouldn't say unfair, but I mean, the expectations, they never would know. I mean, there's [unclear] there's a incentive then to build one place rather than the other because of fees. And this would even it out. Correct.
0:50:24 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
For example, if I may, based on the west zone on its own, up until last year, the intersection of 8th and Carnahan wasn't shown to be in failure. So a lot of development occurred in that area. once that intersection was shown with approved development to need mitigation projects that come through that area and add any trips that intersection must pay mitigation fee so everything that came in before that cutoff date there was zero cost and now now it's on a site-specific distribution specific element and
0:50:56 Councilmember Jessica Yaeger
this this system would make it to where that cost is shared across all development for any projects in that area okay council member yeager thank you So you're talking about these failures. Now, are we talking about wait time, signals, the asphalt itself, the whole process of getting through an intersection?
0:51:17 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Can you go into that just a little bit? Yes. So the failures at an intersection are based on it's today. Now, things are evolving with the current comprehensive plan and multimodal level of service. But today's metrics are level of service based on seconds of delay through an intersection. On our arterial corridors, that's measured across an average of all the intersections, and so one of them can be a little worse, another one can be a little better to average out. But if a level of delay exceeds like 45 seconds on a signalized intersection, then that is expected to be worse than LOSE, and that would be something that has to be mitigated. So that's what I mean by failure, so the capacity of the intersection. Okay, thank you. And
0:52:02 Mayor Laura Padden
so these rates are calculated on a 30-year cycle, I mean, from 2020, or really 2022 to 2050, but they can be reviewed periodically and changed as circumstances change in the city? Yes, ma'am. Yes, and it's recommended they are updated because projects
0:52:22 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
come through and they are completed. As we started this process, the pines-grade separation was in our list. It's no longer in the list because it's funded and under construction. Similarly, right now, the Sullivan and Trent project is in the list, and depending on how funding goes with that, that may be something in the next cycle that comes out of the list, but right now it has not been built. So those are recommended to be updated from time to time, three to five years. Three is a little bit on the short side, but five years is a typical timeline to update those calculations, calculations and also as the impact or the trip generation rates are updated [unclear] there was another piece that i thought i was going to say and i don't remember what that was well so would we have a schedule that i mean that's kind of a hard and fast schedule that we would develop or you would develop that say every five years or whatever yes so every five years or sooner as dictated by projects or um or updates to the trip generation so if we have to go through the whole process and change that based on a manual that changed then we would incorporate all those changes at that time and what I was going to say before is this is all in the past it wasn't an eligible cost the cost to update impact fees is now an eligible cost of that impact fee collection councilmember what so you mentioned Sullivan Trent that it's still included in and you wouldn't think that we'd remove it now even though it's mostly funded it's mostly funded [unclear] it's not fully funded and so having those dollars available as an additional match if needed I think are very important until it was until a project is built it's not recommended to pull it out of that list just because you never know
0:54:05 City Manager John Hohman
council member Yeager oh what I'm sorry city manager just a quick question for Jeremy he related to councilmember Wicks question would we look at the cost of what we're projecting for that project, the Sullivan Trent project, maybe reduce the cost because we have the build award now. So I think, is that something we can look at that might make a minor change to the fees? Yes, we could definitely look at that. We could adjust the cost of any project based on what we know is already funded or not funded, yes.
0:54:41 City Manager John Hohman
Council Member Witt?
0:54:43 Councilmember Ben Wick
So looking at the east, and I know it's kind of deceiving because it has almost twice as many trips, which is kind of your divisor, but just knowing like the Barker interchange that's included in this correct yes because that's the lowest fee but that's deceiving because it has the most potential for growth then, right? Correct.
0:55:02 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
And a lot of the trips that go through the Barker Interchange are not inside the city and therefore not eligible for the impact fees. They're not indicated or they're not impacted as much as growth by inside the city. A lot of that impact comes from outside of the city that we're pursuing with separate avenues.
0:55:23 Mayor Laura Padden
Council Member Yeager. Thank you.
0:55:25 Councilmember Jessica Yaeger
I don't expect you to have this answer, but are we the only state that does this? Do you know, like, how many other states do this or other cities?
0:55:34 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
Can you give me some statistics on how many are actually using these fees to help with the infrastructure? I don't have statistics. I know that all the primary cities across the border in Idaho use impact fees and have for quite some time. Most of the larger agencies in Washington have an impact fee program. I'm not aware of any states that do not allow it, but I am not that well versed. Thank you. Council Member Wick.
0:56:00 Councilmember Ben Wick
Just wanting to share that there's been a lot of rumor around housing affordability, and this is actually something that the Legislative Committee of Utilization of Cities is talking about. Because there's actually some state legislators that are looking at banning impact fees in our state to try and combat the housing affordability. And so that is something that's being talked about in Olympia, another thing to help us out for paying for infrastructure.
0:56:30 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
On that topic, there are current requirements similar to the ADU discussion to where multifamily units have to be scaled. In the past, it was based on the unit. So how many units of mid-rise, low-rise type of apartments now has to be scaled based on the number of rooms per unit and newer fees that are adopted?
0:56:53 Mayor Laura Padden
Well, I guess on that same topic, and it's more of a comment, I guess, than a question, but one of the things I like about option three, which you're recommending, is that it aligns pretty much with the current expectations and also what the city would normally pay for. So it's not like by adopting this, we're not horribly adding to the cost of a house. In fact, we're probably staying within an acceptable range. But it's more uniform throughout the city [unclear] the developers know what they are going to face. Council Member Haley? Thank you.
0:57:39 Councilmember Pam Haley
Yes, I think one of the things I've always heard from developers is they just want to know the price ahead of time, right? They don't want to have to guess how much it's going to cost, so I think that'll help. I also think that one of the reasons people don't like development in the city, citizens don't want to pay for the roads and the problems that occur because of that. I think Carnahan was a really good lesson for us because it was, like, fine until it wasn't, And then the people past that were the ones who had to cover some of that. And honestly, if we don't charge impact fees, the citizens pay for it anyway. So it's just a transfer of the cost to the people who aren't benefiting from it, really. So, yeah, I like option three, too.
0:58:23 Mayor Laura Padden
Other comments from Council?
0:58:27 Councilmember Jessica Yaeger
Councilmember Yeager? I just appreciate Councilmember Wick's comment because that's where I was going with his, you know, building fees and all the bureaucracy that goes around development and people wanting to live here [unclear] that's actually kind of where I was going so thank you for that information okay do we have consensus to move this forward you've
0:58:49 Mayor Laura Padden
got it thank you thank you
0:58:59 Mayor Laura Padden
all right we have another admin report the draft of the active transportation plan with Adam Jackson and Jeremy remains with us and kylie jones adam jackson engineering manager and as you said joined with here at the table by jeremy clark and kylie
0:59:20 Engineering Manager Adam Jackson [attribution disputed across passes]
jones kylie comes from kimley horn she'll give a brief introduction but she has worked here locally on the public side of things and the private sector side of things and is a known professional in the transportation planning industry so we're happy that she's been on our team for this project [unclear] quick intro for our active transportation plan tonight would be that about 18 20 months ago State DOT reached out to the city and said hey we'd like you to develop an active transportation plan so that you can improve the safety of your active transportation network and be more competitive for grant funding programs that we offer.
1:00:04 Unidentified speaker [?]
We said, sure.
1:00:05 Engineering Manager Adam Jackson [attribution disputed across passes]
February of 25, Council agreed. We entered into an agreement with the DOT and we then hired Kimley Horn. this is the first draft or the first touch of that draft to City Council it's not intended to be the last it's our intro to the topic for discussion purposes we intend to have an opportunity such as a public hearing in a few weeks mid to late August so public participation can review this and give input and then we'd look to return for a workshop or study session with council that brings it all together and see how it all melds together for a final draft. Tonight's discussion is intended to just share our process taken, the engagement we'd seen, and how that trickled into this draft deliverable for your consideration. So with that, I'll kick it to Kylie.
1:01:03 Kylee Jones (Manager) [name read from caption]
Great. Good evening, Mayor and council members. My name is Kylie Jones, as Adam mentioned, I do work with Kinley Horn. I grew up here in Spokane Valley, and today my family still lives, works, and recreates here. My son goes to CV, and so the topic tonight is very timely. It's a discussion we have in our household, so I was excited to be able to work on this planning effort, and you know, the work's not done, but we're happy to be here in this milestone tonight. Professionally, my background is in transportation planning, transportation funding, and public engagement. And having the historical understanding of the valley and the local context, that allowed me and my team to develop a very tailored plan for Spokane Valley. And so we'll get into a little bit of the process tonight. This graphic illustrates our planning process. [unclear] similar planning processes have gone through something like this [unclear] so I'll just kind of a high level explain how we began so we we began with looking at the the city's existing plans and policies and then from there we reviewed existing conditions transportation related data we gathered community engagement community and stakeholder input completed our technical analysis and identified transportation needs. And then the final plan is really a compilation of all these pieces working together, not a single data set or a single public comment.
1:02:41 Kylee Jones (Manager) [name read from caption]
Community input was part of the planning process. So for this particular project, we met with community members at Spokane Valley community-hosted events like the Winter Market at Center Place. We used online surveys. We had an interactive mapping exercise. We also used a stakeholder working group throughout the process to validate the feedback that we heard from the broader community with what our stakeholders were hearing from their constituents and communities. And so the stakeholder group included leaders from Spokane Valley Police Department and the school districts, the DOT, Spokane Transit, the health district, and community organizations. [P1: Just] this has a lot going on in this slide but really the takeaways here um we highlighted some of the spoken valley active transportation plan engagement efforts um and some of the the stats there but we also compared what we were hearing during this effort with the comp plan and the parks plan outreach across these planning efforts some of the same themes consistently emerged which were improving safety, completing missing connections, and improving access to schools, parks, businesses, and everyday destinations. Those themes closely aligned with what we found throughout the technical analysis as well. And it's not on this slide deck, but I was also the public engagement lead for the Spokane Valley Parks Plan update. And so I was able to engage with community members at open houses, online, at different events like Valley Fest and Breakfast with Santa and other. And so the key takeaways through that separate process was, you know, something that we heard over and over again was the facility type slash amenity type with the highest indicated need was multi-use paths and trails. And so many of the responses of the online Park Survey came down to improving access to green space through safe and connected multi-use routes. So it was interesting to see how these different planning efforts had significant overlap in the themes despite different community audiences and venues. Those reoccurring themes became the foundation for the development of the six plan goals and the vision for the future of the network, which was then again validated through additional community engagement and stakeholder engagement. Hey, Kelly, can you go back to that? Sure.
1:05:16 Engineering Manager Adam Jackson [attribution disputed across passes]
i just wanted to touch on this so the uh the vision statement here and the goals identified here are uh are pretty consistent with the plans and goals and policies that staff have worked within you may recall about a month ago uh kristen armstrong and i presented the six-year tip and we walked through the process on how we create these projects in this six-year plan and it starts with council vision values goals and we trickle it down and you may recall a particular slide that had cover pages of all the studies and planning documents that help set the direction for staff to follow to deliver these objectives that are identified that sheet of cover pages this active transportation plan and these particular goals would be rolled into that process and i just wanted to connect that to how we at the staff level apply our forces because this this plan is a policy directive from council to staff to the community that this is how we want to deliver a network for all users and so the act of transportation plan these six goals listed are fairly consistent it's not a surprise that they're fairly consistent with the goals and policies that are already in our comprehensive plan today and will likely show up in our updated comprehensive plan here in the coming months so [unclear] just wanted to make a note of that for a sake of consistency and drumbeat and how this will impact us in the future at the council and
1:06:56 Kylee Jones (Manager) [name read from caption]
staff levels thank you great thanks adam um so next in the planning process we looked at existing conditions i kind of touched on this early in the process um we looked at spoken valley's transportation system and how it functions today [unclear] evaluated crash history roadway characteristics sidewalks bicycle infrastructure the proximity to schools parks and transit and you know ultimately like where people live and work one important takeaway is that this work references many of the same findings of the city's local road safety plan so that data is consistent across both planning efforts. Ultimately, this is also a safety-focused planning effort. The goal is to identify locations where future improvements could reduce conflicts and improve predictability for everyone using the road, including drivers.
1:07:47 Engineering Manager Adam Jackson
And we didn't plan it this way, but this is the 8th and Carnahan intersection. If you're not familiar, it's a four-way stop-controlled intersection. This is looking east on 8th Avenue. Thanks. Yes.
1:08:04 Kylee Jones (Manager) [name read from caption]
So what we conducted and evaluated the network using a tool and data analysis process called the level of traffic stress. And so this is, again, a planning tool that helps describe how comfortable or stressful a roadway may feel for someone walking or biking. And level one represents low stress conditions, while level four represents locations with characteristics like perhaps higher speed, additional travel lanes [P1: or] heavier traffic. Again, it's just another tool that the city can use when evaluating future transportation projects. And this particular analysis, this level of traffic stress, excuse me, helped support the comp plan and new GMA requirements for multimodal level of service.
1:08:58 Engineering Manager Adam Jackson [attribution disputed across passes]
Also, the level of traffic stress, it was introduced about three or four years ago at the state DOT level. And it has trickled into just about every state funding program, particularly these active transportation programs, where for pedestrians or bicyclists, the active user, the level of traffic stress is a metric that you need to satisfy as a funding requirement. And so it's considered here because it's been absorbed as an industry standard here in the state, but also it is connected to the funding requirements with most programs.
1:09:33 Kylee Jones (Manager) [name read from caption]
Looks like our network got a little stretched out there. So next, in the planning process, we combined several different data sets into a single needs assessment. That included, again, things like crash data, access to school parks, employment, demographics. And rather than looking at each of the factors individually, this helps identify, again, where the locations of future projects could address multiple transportation-related needs at once. So you can kind of see that heat map underneath is a reflection of that process. And it, again, also provides an objective way to compare projects and strengthen future transportation funding applications, which I know we've talked a lot about tonight.
1:10:23 Kylee Jones (Manager) [name read from caption]
So this is a map of the proposed active transportation improvements and studies. I'll just explain the legend for folks. So in the blue is recommended corridors that need to be studied further. We just didn't have the time to deep dive into these, and so we're recommending that they have their own separate planning effort because there's a lot going on. And the orange dotted line is sidewalk infill projects, and the green are bicycle improvements slash shared-use paths. Again, we're kind of lumping in, you know, facility types together because each of these will come through, you know, the current city process and city council process [unclear] projects shown here the the lines shown here overlay
1:11:12 Engineering Manager Adam Jackson [attribution disputed across passes]
the city map they're not new necessarily about 80 of these lines are in our existing comprehensive plan with a future sidewalk or bike route or it's an existing shared bike and vehicle facility these projects aren't and this plan for that matter aren't intended to replace vehicle use on the network but it's intended to promote active use on the network for everybody should they choose or need to not be in a vehicle but again these projects which are tabulated in the report form of of uh the council packet these projects aren't necessarily new the studies the corridor studies we've talked about at council with relation to safety planning grant programs uh sullivan and sprague in particular and also pines road state route 27 for that matter where the dot acknowledged from their side they were looking at crossing improvements between sprague and mission [unclear] so we have those on here because not not to recreate and do another study but there's so much if you see the heat maps and you look at our zoning our land use maps where our busiest streets are they're consistent with these arterials and so um a safety program will say take away all the left turns well i'm pretty confident that our economic development division would say that's going to impact our businesses so so there's there's an element of coordination that these studies would want to get into and they'd likely be delivered in segments like any project on here we're identifying long stretches but the delivery is likely in segments that are bite-sized for the available capacity whether it be staff funding community capacity for what these improvements might be thanks all right
1:13:15 Kylee Jones (Manager) [name read from caption]
and so finally in addition to the projects and studies the plan identifies implementation strategies and potential funding opportunities many transportation grants as Adam mentioned look for projects that are that address and document safety needs and improvements and are supported by an adopted plan so having this document in place helps [unclear] valley compete for those outside dollars when opportunities arise and it simply again gives the city another planning tool to support future decisions and i guess on that you know the policy recommendations are you know the five e's engineering education encouragement enforcement and evaluation and then the funding programs are identified are you know local state and federal programs. And then to just wrap up, the plan provides three primary benefits. It documents transportation needs using objective analysis to improve safety of all road users. It supports the comp plan update and the new growth management requirements. And it gives you all an even greater foundation for pursuing future transportation funding instead of relying on local funds so happy to take your questions unless adam has anything else you'd like to add thank you jeremy questions from council council
1:14:44 Councilmember Ben Wick [attribution disputed across passes]
member wick i guess i have questions about the map but maybe this isn't where i should be asking those today do you want questions on the map or do you want questions on the philosophy of the program you know if we could talk maybe about the process taken if there is, I don't want to deter questions on the map because those
1:15:04 Engineering Manager Adam Jackson [attribution disputed across passes]
are a very important outcome of this process, but for this, the project map is my guess. [unclear] it might be cleaner if we have a more documented process but that have at it if you'd like I'll catch you after okay thank you
1:15:33 Mayor Laura Padden
other questions
1:15:38 Mayor Laura Padden
comments I have a few comments so thank you for your presentation I know a lot of work has gone into this which I very much appreciate this is a policy statement as I see it a document that really is a policy statement from the city and will impact the the projects and the planning for many years to come so I really think you know we need to be able to go through a lot more of this I haven't had a chance to go through all of it so I want to study it more and I am concerned about certain grant rate requirements that you know we've all seen that they require and have strings attached and and you know you all can say well if it doesn't fit your policy you can turn it down but then there's always the pressure that while grant money coming back is helpful for the city on projects and you know so how do you balance that and be fiscally responsible I also think the city has priorities and even in this document the priorities is well at least from public comment coming back is safe routes to schools sidewalk infill and repair roads rather than adding all kinds of you know new areas of paths and sidewalks and biking. So there's still a lot of information that needs to be gone over. I do actually have kind of a, I don't know, I mean, this stress tool I have issues with, level of stress, because it seems to be all, you know, physical things, posted speed limits, number of travel lanes existing facility types and [unclear] volumes but i look at the map and it's like okay there's east broadway avenue which is level three it looks like there's mcdonald south mcdonald which again is level three and that has a sidewalk it has a bike lane and the lanes are are wide and i ride my bike there i've ride i ride it on broadway i feel very comfortable there so i'm sitting there going like maybe i'm insensitive to danger but i just think that this level of stress tool might you know need a little work i i you know and i know you're saying it's well it's statewide or whatever and they're using it all but i have issues with it um so that's kind of where i'm coming from
1:18:27 Unidentified speaker [?]
thank you
1:18:30 Traffic Engineering Manager Jerremy Clark
councilmember wick i'll jump in now all right
1:18:35 Councilmember Ben Wick
[unclear] i agree the level of stress was an interesting one for me as well um but i think it kind of it's one of the tools that fed into your proposal of the active transportation improvements and studies so i didn't spend as much time focused in on on the the level of traffic stress analysis but more of what it fed out of the system, which is those studies. And I think some of those I had never heard of before, like looking at Trent, State Route 290. You kind of show on there, which is a corridor, or actually it isn't even listed as a corridor study, but noted that one needs to have more bicycle improvements or shared use paths. And that's one I've heard of because I kind of live in that side of the town. I've heard of forever that it's really hard to walk down or try and do any kind of bicycling and cross State Route 290 or Trent Avenue. So I was very happy to kind of see that in the list. It's in our current comp plan, too. It's on our active list right now. And so I apologize. No, no. I just recognized that. But it has been one that the community has talked about ever since I was in school and how it is very hard to cross there. I see the [unclear] and some of these, to me, it's identifying projects, if I'm reading you correctly, that we're not saying that these have to be our top priorities. We're going after grants right away. But having a list enables us to, as we come through and have opportunities, and then we get to decide as a council if those are the opportunities that are right for us or whatever. But we can't go after them if we don't have a plan that kind of lists them. And so [unclear] think some of them are right on very very very well done and kind of the outputs i agree that the sullivan corridor the sprig seems like it makes a lot of sense um pines we talked about a little bit earlier some of the ones that are kind of kind of missed i think of like indiana i know that we had a lot of sidewalk infill that we've been trying to do on indiana i didn't see that kind of come up on the list [unclear] so kind of some of that like flora we've been talking about for a number of years how do we connect that across how does it make it wider i think it also kind of looks at some of the roadways that say maybe the roadway needs to be widened and i know that's kind of out of the scope of this a little bit but as you look at shared use paths and and sidewalks i think some of the roadways are pretty narrow and some of the residential streets are identified here but as you kind of mentioned you're this is just to kind of highlight an area and then when we got to actually go to do that that's when we look at the well maybe the road needs to be widened or or what the real solution is
1:21:14 Engineering Manager Adam Jackson [attribution disputed across passes]
if i'm yeah i thank you for saying that that's uh i didn't mention that um but we do we do we work really hard to make sure that the projects that we put forward as staff recommendations to council for funding applications that they are as best aligned and most competitive with the funding programs but we're doing that knowing the strings that are attached with any given funding program but we do that knowing that we're trying to best represent spokane valley priorities for our community and that's the balance that we try to work through when we evaluate project proposals and so we we use our street standards our complete streets ordinance and policy we use our we we look at our safety and crash data our local road safety plan all these variables have helped us kind of push us in one direction or another that help us bring forward what we think are most competitive projects that are bite-sized or deliverable
1:22:22 Deputy Mayor Tim Hattenburg
[unclear] mayor yeah i appreciate your comments and bite size i we had the conversation earlier you and i did about i grow from sullivan on eighth i've done it many many times but just really paid particular attention there's a lot of areas on on eighth that have very wide shoulders now but we did do some improvements it doesn't automatically mean that we don't have the room there's parts we'd have to adjust probably or may not do that but as you said we're not going to do it all the way from Sullivan to the dish with Mike in one chunk and I'm looking at the map if if it was like Sullivan to McDonald or Pines you know so I think that that's that's good to know it's not like we're saying to a public that hey we're just going to do it all the way across the city and whatever whatever road or street it is so I think the approach you're taking is right
1:23:09 Councilmember Pam Haley
council member Haley also [unclear] typically we don't go in and make bike lanes so we typically put a bike lane and when we're already working on that portion of the road so it's not like we're going to go in and just miraculously come up with an entire street of bike lanes [unclear] and we actually went through this at srtc as well on the stress analysis and whether you love it or hate it the state uses it and so i can definitely see why we need to have that because there may be something we need to have done on that street that has nothing to do with the eventual bike lane that will appear when we work on that road [unclear]
1:23:49 Traffic Engineering Manager Jerremy Clark [attribution disputed across passes]
we still want the grant to help us work on the road so yeah i i agree with the way you're doing this if i could touch on that level of traffic stress metric and and there's there's a lot of different opinions on that and and mayor patten i completely agreed with you on it seemed very foreign to me for quite some time until I spent more and more time out there walking different pieces of the street and essentially what it does is it normalizes for traffic crashes our roads are people that are driving cars if there's an issue there's a crash trend at a location we have a lot of pedestrian crashes you don't see as many pedestrian crashes as you do vehicles because there aren't that many pedestrians and so level of traffic stress is a way to normalize that as to well pedestrians aren't comfortable walking here or bikes aren't comfortable biking here and I'll be fair to say I'm comfortable biking anywhere in the city but as soon as I throw a small person behind me on a bicycle that LTS completely changes and so that's what the metric is kind of used for there are some issues that we've identified with the wash dot system and what's in the design manual and how we may modify that moving forward as the city works for adopting a multimodal level of service standard.
1:25:04 Kylee Jones (Manager) [name read from caption]
But it's just another way to look at things because we can't base everything for pedestrians and bicycles on crashes alone. [unclear] the LTS and I'll just add the LTS is added on top of the network needs and so it's just another data layer without getting with how that shows
1:25:24 Engineering Manager Adam Jackson [attribution disputed across passes]
up or doesn't show up an LTS one two three or four those are the one is the most comfortable four is the least comfortable LTS one and two are above the line and three or four below [unclear] access streets have a speed limit of 25 miles an hour and travel directions two lanes one each direction there's a matrix for for how you score your lts one two three or four those two factors partnered with the volume local streets have a smaller count of vehicles on them trigger nearly all of our local streets as an lts2 so when we go to a funding agency and say we want to improve a local street they're going to say well why would we spend money on an lts2 with low car car count and and low volumes and an okay comfort level when clearly you can't get across bregg or trent and so lts one and two comes into the consideration at the community level because we hear public input saying i want my family to be more comfortable walking from my home to that destination well it probably starts on a local street and works its way up to collectors or minor arterials and it gets busier but that's a result Well, this map matches, I guess this is our LTS map, but it matches our arterial network pretty closely because the vehicles are a big factor in that. And local streets, even though that's where the users probably start or finish their trip, they have a relatively low stress. So they don't rise to the need that other streets would rise to.
1:27:16 Kylee Jones (Manager) [name read from caption]
Go ahead. I'll just add that this particular map is the pedestrian LTS map, and we have a separate one for the bike LTS. We just didn't put it in the presentation.
1:27:31 Mayor Laura Padden
Other questions, comments? All right.
1:27:36 Engineering Manager Adam Jackson [attribution disputed across passes]
So what we'd look to do is move forward. I'd work with our clerk's office to schedule a public hearing or opportunity for public comment, and then we'd propose to possibly come back to council with a study session and discussion to just kind of bring it all together, if that's acceptable.
1:27:57 Unidentified speaker [?] [earlier-pass label: Adam Jackson; unconfirmed]
I see a bunch of nods. Okay, thank you for your time. Thank you. Thank you. Good night. All
1:28:14 Mayor Laura Padden [attribution disputed across passes]
right, that brings us to our second general public comment opportunity. The rules are the same.
1:28:37 Mayor Laura Padden
Okay. On the list. Okay, thank you. Anyone else?
1:28:50 Mayor Laura Padden
How's it going?
1:28:51 Public commenter: Blaine Slacks (name as heard)
Blaine Slacks, Spokane Valley. Just had a couple questions or concerns with the transportation. [P1: I] just noticed that there wasn't very many elementary schools or schools in general going through the criteria i did have a level of concern is that we were rating schools and school parks as two separate instead of one i think that would change around the way that the scoring happens a little bit maybe it put more influence into the actual safe routes to school which would match up with what the public is asking for by that what i'm saying is as we looked at that rubric we had 10 points associated for a school 10 points associated for a park as you move out farther into closer to Barker such as Green Acres Elementary we don't have a park so our school is our park you know not asking the city to build a park by any means that I think we all can agree as well out of scope but just asking for that rubric to be reevaluated [unclear] you know we did hit on is that a stress test accurate um reviewing that stress test i I would personally have some concerns. I would agree with you guys with what you asked for. However, understanding that DOT is a DOT, they have to measure it some way. So, ultimately, just asking, maybe in the next couple weeks, as we progress with the transportation plan, maybe we take a look at this from a different angle and match up with what the citizens are asking for as far as safe route to school, just to find a good, clear path. So, anyways, thank you, guys. Appreciate it. Thank you.
1:30:41 Public commenter: Jonathan Plum (name as heard)
All right, good evening, Mayor, Council Members. My name is Jonathan Plum. I live here in Spokane Valley in precinct 4438. I actually live about a block away from where we keep talking about the 8th and Barker roundabout here. As I've been walking my precinct and speaking directly with neighbors, two local traffic concerns have repeatedly been brought to my attention. The first concern is reckless driving on 8th Avenue east of Barker Road. Multiple residents living along that stretch have reported that it occurs primarily after dark. I understand that portable radar displays showing drivers their speed have previously been placed in this corridor. Those devices may help ordinary drivers who simply lose track of their speed, but the continuing complaints indicate that they have not resolved the deliberate or habitual reckless driving residents are describing. I'm therefore asking whether the city can arrange targeted observation or enforcement during the identified hours, along with a short-duration speed study or another method of documenting the speeds and patterns involved. I've already provided Council Member Merkle with additional location-specific information privately, and I would be glad to provide any appropriate details to law enforcement or city staff. I do not intend to publicly identify suspected residents before the facts have been properly verified. The second concern involves the proposed roundabout at Barker Road and 8th Avenue. A commercial truck driver who lives in my precinct told me that some roundabouts can be especially difficult for large commercial vehicles to navigate. He said he frequently sees trucks either damaged or causing damage while passing through them, and he specifically cited the roundabout at Barker and Sprague as an example. I'm not asking the city to reject a project based upon one person's experience, nor am I presenting myself as a traffic engineer. I am asking whether Public Works can verify and explain how the proposed Barker and AVE design will accommodate full-size commercial vehicles. Specifically, I would like to know what design vehicle is being used, whether sweat path analysis has been completed, how the truck apron is being designed, what repair history and costs exist at comparable local roundabouts, and whether commercial drivers who regularly travel Barker Road have been consulted. These are not abstract political issues. They are concerns brought to me directly by residents who use these roads and live with the consequences. I've already sent both matters to Council Member Merkel, but I wanted the full council and city staff to hear them as well. I respectfully ask that the appropriate departments review these concerns and provide a response. I also want to add one more comment. [unclear] council member yeager had talked about the the flock or sorry sorry uh it was the city manager who told us the flock cameras had been canceled um that's pretty cool i love that news i am curious if they're still up however and functional and that's all i have thank you
1:33:41 Traffic Engineering Manager Jerremy Clark
city manager
1:33:43 City Manager John Hohman
i can respond to the gentleman's comments um starting with the last one first [unclear] the flock cameras as i mentioned have not been active since the end of march of this year so they have not been working and um i assume because they are property of flock that now that the contract has been dissolved that flock will come and collect their equipment and take them off those poles because those were leased cameras so the county was paying a monthly charge for those so I imagine they'll be taken away. In relation to the traffic problems on 8th east of Barker city limits are at Hodges so a little bit east of Barker. Chief Ellis is here and we can have that discussion with him when you get past the the city boundary that's unincorporated area but I'm sure our officers are out doing work out there so that'll be something we can follow up with Chief Ellis on and then we'll I'll ask director Works Director Blagan to connect with Mr. Plum to have that discussion about the design criteria on the roundabouts.
1:35:13 Mayor Laura Padden [attribution disputed across passes]
thank you i see no one else wanting to make a comment so we'll go on to council comments councilmember yeager i don't have anything thank you councilmember haley nothing to report councilmember wick nothing tonight whoa likewise
1:35:39 Mayor Laura Padden
well okay i'll make a comment
1:35:43 Unidentified speaker [?]
Broke the streak. Yeah, sorry.
1:35:48 Mayor Laura Padden
Well, I did want to inform the public, and they probably, I don't know if they know or not, but on our lawsuit with Councilmember Merkel, which the judge ruled on earlier, and ordered that he comply with his mandatory duties to obey the law and turn in his record. He has also now filed an appeal to the decision of the Superior Court Judge, and I feel, in my own opinion, [unclear] it's somewhat unfortunate on several levels. He had previously claimed he was waiting for a court order from a real judge as he rejected his training, the legal advice of our city attorney, the investigator's conclusions, an attorney investigator's conclusions, and an attorney hearing examiner's findings of facts and conclusions. And now the court order from a [unclear] from a [unclear] court judge has come, and he has rejected that as well. And I would like to clarify that a superior court is not a lower court. It is the highest court. [unclear] order [unclear] a [unclear] order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order from a court order highest trial court level in Washington State. [P1: You] know this was a chance you know to have some accountability to stop the unnecessary spending and to adhere to the rule of law and uphold what the court had ordered and comply with his mandatory obligation under the law but so we'll see there's you know as it moves again through another process of appeal but so that's that despite it all there's lots of positive accomplishments and news in the city and we have the state of the city tomorrow where we will go over what's been going on and a lot of details of the positive things so some of them are you know the course is functioning well and we had a soft soft opening last fall and now we have a full slate of races and it's pretty exciting there'll be thousands of people and athletes coming to our city paying our hotels eating in our restaurants and spending money at our retail stores if you drive down Sullivan north of the river you can see the construction going full bore on our new ice rink facility that should be open next summer and that again will bring tons of outsiders athletes and and ice skaters and when they have tournaments and into our city and spending money here which will increase our sales tax revenues and keep your taxes lower and both of those venues are also wonderful community locations and venues for our kids and our adults the course when there's not a race there people can go and run around it they can walk around it they can walk their dogs or they can just sit you know and enjoy the park it's beautiful and of course the ice rink is actually going to have and it's written in the lease that there will be programs low cost and free programs for our kids at times for them to go and learn how to skate or just you know do so i mean there's other things all kinds of activities around the ice rinks we got a great news with the 20.8 million grant for the sullivan trent project, which is an amazing thing. That's the third very large federal grant that we have received for our very large transportation projects that have a very large impact, not just on the city, but on the entire region. essential cogs in our industrial and commercial areas and businesses that they can ship [unclear] safety features to celebrate the railroad separate the railroad from regular traffic you know we've welcomed all kinds of new businesses to our city in the recent years Dave and Buster's [P1: Oh] gosh oh crumble cookies how can i forget the trader joe's is coming um you know and then we have uh expansion projects solstice being the biggest in the region as they are i think it's a 200 million dollar expansion there in our manufacturing area so a lot of wonderful things going on in the city a lot to be thankful for a lot to be proud of a lot that you know city staff has accomplished and and [unclear] guess i should say some of you know based on the decisions of city council as well that these things can happen so um some very very positive things and i think we we can all be proud of our city so thank you on to city manager comments
1:41:16 City Manager John Hohman
thank you mayor padden council members i do appreciate your comments tonight mayor it's lot to celebrate here and a lot of great work that we have all collectively put together over the years and following your guidance and your policies and your approvals on all these different projects and plans that we've put together and your work advocating for all those those have been incredible work but incredible teamwork both from the council the community and staff so I do appreciate your comments a couple of updates just we talked about the streets and the surface treatment program Previously, Public Works had talked to the council about the chip seal projects that were going to occur, and now we have the actual dates that they're going to start. August 3rd, the county will be chip sealing Sprague Avenue from Appleway to Hodges, excluding the roundabout at Barker. And then August 10th, they'll start 32nd SR27 to Best Road. So those projects will be moving forward. A lot has gone on during this construction season, and we apologize in advance to the community as they try to drive through all these projects. At least these can be opened up in short order. Actually, the traffic helps to push the chips down into the oil, so that helps. But to remind the drivers to drive slower, because the chips can be loose, and they can get all over the place. And so just wanted to let the council and the community know that those projects are upcoming, and that's all I have for you tonight.
1:43:16 Mayor Laura Padden
Move to adjourn. Second. All those in favor? Aye. Opposed? Opposed? We are adjourned. ---