0:00:06 Unidentified speaker [?]
[unclear] okay.
0:00:13 City Clerk Marci Patterson
Mayor Haley, it's six o'clock when you're ready.
0:00:16 Mayor Pam Haley [attribution disputed across passes]
Okay, we'll go ahead and bring this meeting to order. This is the Spokane Valley City Council regular meeting in formal A format for Tuesday, December 23rd, 2025. And then if everyone will stand, we'll have an invocation from Brian Noble from Family Policy Institute of Washington.
0:00:38 Unidentified speaker A
[unclear] Father, we just thank you for this evening, God. And we thank you for our council members. We pray for abundant wisdom upon their lives. God, we thank you for this season that we are in. And the Prince of Peace came that we may have peace both in our town and our cities and around the world, God. And so, Lord, we thank you that you go before us, that we can remember all the wisdom that you have brought, the things that you've brought to our life, the blessings that you've brought. And God, would you just bind us together as a community group, as a people group, that we would be of one mind and that we would walk in just a boldness and courage to honor you, but also that we would find ways and areas of agreement. So I pray for wisdom in this room tonight. I pray that you would give direction to each of our council members. Lord, let them know the main things and allow them just to have your wisdom tonight. In Jesus' name, amen. Amen.
0:01:29 Mayor Pam Haley
Thank you. Now join me in the Pledge of Allegiance.
0:01:32 Unidentified speaker B
I pledge allegiance to the flag of the United States of America, to the republic for which it stands, one nation under thy God, indivisible, liberty and justice for all.
0:01:50 Mayor Pam Haley
Thank you. That brings us to roll call with help from Ms. Patterson.
0:01:54 City Clerk Marci Patterson
Certainly. Mayor Haley? Here. Deputy Mayor Hattenburg? Here. Council Member Wick? Here. Council Member Higgins? Here. Council Member Yeager? Merry Christmas.
0:02:04 Mayor Pam Haley
[unclear] council member badden and Merkel Merkel and council member padden second all those in favor opposed they are excused thank you next we need to approve our agenda move to approve the agenda second all those in favor aye opposed all right the agenda is approved unanimously madam
0:02:31 Councilmember Rod Higgins
mayor yes If I may, it's my understanding that the federal government has decided to give the day before Christmas, Christmas Eve, a full day off for their employees. The county has also done the same thing. We, on the other hand, currently give a half day off. I would like to move at this time that we give our employees the same as the feds and the county and take Christmas Eve off in its entirety.
0:03:10 Mayor Pam Haley
I have a motion and a second. Are there any questions or comments? Council Member Wick?
0:03:16 Councilmember Ben Wick
That's tomorrow, right? Okay. Do we have enough time to notify employees?
0:03:23 Unidentified speaker [?]
We will definitely figure it out.
0:03:27 Mayor Pam Haley [attribution disputed across passes]
they're probably all listening in right now anxiously waiting got it okay are there any comments from the public everybody say yes okay all those in favor aye opposed motion passes unanimously. Thank you.
0:03:50 Mayor Pam Haley
There are no proclamations or special guests, so we'll move into our general public comment opportunity. This is an opportunity for the public to speak on any subject except agenda action items, as public comments will be taken on those items where indicated. Please keep comments to matters within the jurisdiction of the city government. This is not an opportunity for questions or discussion. Diverse points of view are welcome, but please keep remarks civil. Remarks will be limited to three minutes per person. If a person engages in disruptive behavior or makes individual personal attacks regarding matters unrelated to city business, then the council and or mayor may end that person's public comment time before the three-minute mark. You may also comment via Zoom. Do we have anyone on Zoom this evening? No, we do not.
0:04:50 Mayor Pam Haley
[unclear] Lund. [unclear] Lund.
0:05:03 Unidentified speaker C
Well, Merry Christmas and Happy New Year to everybody. And tonight I wanted to speak on two things. Number one, just for Rod Higgins, that we thank you so much for your appreciation for our valley, the hard work that you put in. And thank you.
0:05:34 Unidentified speaker [?]
And then, sorry,
0:05:45 Unidentified speaker C
the other is our community for voting and the tax that we have so we can have more police protection. And over December, the patrols or whatever went out to stop, help curb shoplifting was highly successful. I'm very disappointed in our news media for not picking this up. advertising this [P1: is] a critical issue for our community and they hardly even spoke about it and then of course the when they did their raids and working with the what's the other one they worked with but finding all these major criminals that are in our area and you know we've had a lot of chatter that how unsafe that stuff is and I'm getting really tired of that and and the evidence that we have is that we're getting better at it we've got it funded and I think we all just need to take a breath and say thank you thank you John Robertson I'm
0:07:21 Public commenter (name not captured)
John Robertson and I'm a resident of the Spokane Valley and [P1: Madam] mayor council members and our population that citizens that live here so thank you all for being here this evening on behalf of all the masons in eastern Washington I'd like to make this presentation to the City Hall in honor of Rod Higgins and it's a picture of George Washington and George Washington was a Mason. And a couple of things that I have to go with this. This is George Washington's rules of civility. So I have noted a couple of them. Every action done in company ought to be with some sign of respect to those that are present. That's the first one. And strive not [P1: with] your superiors in argument but always submit your judgment to others with modesty
0:08:35 Public commenter (name not captured)
conversation be made without malice or envy for tis a sign of a tractable and commendable nature and all and in all cases causes of passion admit reason to govern
0:08:54 Public commenter (name not captured)
while you are talking point not with [P1: your] finger at him of whom you discourse nor approach nor to near him to whom you talk especially to his face let
0:09:11 Public commenter (name not captured)
thy carriage be such as becomes a man grave settled and attentive to that which is spoken contradict not at every turn what others say be not tedious in discourse make not many discretions nor repeat often the same manner of discourse labor
0:09:36 Public commenter (name not captured)
to keep alive in your breast that little spark of celestial fire called conscience on behalf of all the masons in eastern washington on behalf of the residents of spokane valley i thank you for your service and your friendship and what you have done for our community and you will your advice is greatly appreciated. Thank you, Rod.
0:10:12 Unidentified speaker [?]
Can we get a picture?
0:10:14 Mayor Pam Haley
Yeah, let's do that.
0:10:18 Unidentified speaker [?]
Picture. We're going to take a picture of you with your picture. And Mr. Robertson, too. please [unclear] yeah do
0:10:40 Unidentified speaker D
you want to stick him with you yes okay that brings
0:12:13 Mayor Pam Haley
us to the end of those who've signed up but is there anybody here who wishes to comment
0:12:26 Public commenter (name not captured)
daryl williams spokane valley first of all i want to wish everyone a merry christmas and happy new year I'm not real fond of the phrase happy holidays, but to each his own. This is a time of merriment. It's also a time of remembrance. Some of you know about the don't drink and drive signs. I lost my oldest grandson at Trenton Mission, and they've got the don't drink and drive signs there. And there's been discussion about removing them everywhere, even the don't text and drive. And as I understand, WSDOT has put that on hold to get feedback from everyone. I'd like to invite anyone, pro or con, to contact WSDOT and voice your opinion. Oh, I'm trying to look at the crowd. I do karaoke, so I work in a bar. I basically have been a club owner, club manager. And of course, I drink. But the main thing is not judging someone for drinking, but how far the drinking goes. [P1: Anymore] with our law. Basically, one mirror, one shot, you get pulled over, you can technically get a DWI or DUI. So, I want everyone to be cautious. Everyone here, I'd like to see you here after the first year and I'm losing anybody because they've been watching the news we've lost some people already and it's not even the holidays yet so be careful at your parties because there's generally no bartender everyone's self and themselves [unclear] why have a responsibility oh i am a member of mad i've been kind of accused chariot uh chastised for being a member of mad because they said well you drink and i said well i happen to be very good friends with linda thompson who's they had person there and my grandson's photos and they're up there it's not a question of if drinking is legal or illegal it's responsible drinking so everyone enjoy Christmas New New Year's Eve, and hope to see you all next year. All of you also. Thank you very much.
0:15:09 Mayor Pam Haley
[unclear] you. Is there anyone else who wishes to comment?
0:15:24 Unidentified speaker [?]
Deb Schrock.
0:15:28 Public commenter (name not captured)
[unclear] wish you a Merry Christmas, we wish you a Merry Christmas, we wish you a Merry Christmas and a Happy New Year. We just want to say thank you so very much for all that you folk have done for this past year. So many positive things, and we're still upright and ending the year positively, looking forward to the new year and hopefully it won't be as up and down, but we're in for the long haul and Rod, thank you so very much for all your service to the community and you will be missed and we'll enjoy having Mike with us, so just wish you all the best and look forward to the new year. Thanks. Thank you.
0:16:15 Mayor Pam Haley
[unclear] there anyone else who wishes to comment? Seeing
0:16:21 Mayor Pam Haley
none we'll move on to our consent agenda. Is there anything anyone wishes to have removed and considered separately?
0:16:28 Deputy Mayor Tim Hattenburg
Move to approve the consent agenda. Second.
0:16:31 Mayor Pam Haley
I have a motion and a second. All those in favor? Aye. Opposed? Motion passes unanimously. That takes us to our action items. Up first we have resolution 25-013 our master fee schedule with Ms. Patterson please.
0:16:48 Deputy Mayor Tim Hattenburg [attribution disputed across passes]
Oh first. Nope. [unclear] don't need to do that it's a resolution not an ordinance so sorry move to approve resolution 20 number 25-013 repealing and replacing resolution number 25-006 and approving the master fee schedule for 2026.
0:17:04 Mayor Pam Haley
second i have a motion and a second with us tonight we have dan domries
0:17:10 Accounting Manager Dan Domrese [attribution disputed across passes]
good evening council daniel domries accounting manager i'm here to present the proposed resolution setting the master fee schedule for 2026 the current master fee schedule setting 2025 fees was amended with resolution 25006 on april 15th 2025 there have been three previous actions taken related to the proposed 2026 schedule on october 21st council reached consensus to increase permit fees in the 2026 fee schedule based on an in-depth evaluation of costs and comparison of fees of nearby jurisdictions [unclear] November 25th council reached a consensus on the establishment of fees related to the rental and use of the course at Spokane Valley and then on December 9th council agreed to bring the proposed resolution which repeals the existing 25 master fee schedule with the 26 master fee schedule before you fee changes not related to the previous council consensus and schedule a planning our adjustments related to the change in the consumer price index the calculated increases 2.6 4 percent for fees of $20 or more under Schedule B the permits there under Schedule B permits there were a few minor changes not related to previous discussions and then Schedule C parks and recreation in addition to the course related fees there are a few minor changes primarily to account for additional amenities available for use I welcome any questions or
0:18:30 Mayor Pam Haley
comments questions from Council? Comments from the public? Comments from Council? All those in favor? Aye. Opposed? Motion passes unanimously. Thank you. Next up we have a motion consideration on the GARCO change order.
0:18:52 Deputy Mayor Tim Hattenburg
Move to authorize the city manager to execute change order number 12 with GARCO construction the amount of [unclear] billion one hundred thirty thousand for the identified work on City Hall.
0:19:02 Mayor Pam Haley
Second. I have a motion and a second. With us tonight, we have Glenn Ritter and company.
0:19:11 City Manager John Hohman
Good evening, Mayor Haley, council members, John Holman, city manager. Here with me tonight is a cast of characters. We have Clancy Welch from GARCO, Glenn Ritter, project manager on the city hall, and then Jenny Nickerson, our building official. So we wanted to talk to you tonight about the next phase of the remediation. And then on top of the remediation, there's a couple of items that need attention as well that we wanted to discuss with you. So to take you back in time and the members of the community that are here tonight that don't remember the ongoing saga with the building, I'll give you just a very brief look back on where we came and where we're at right now. So the building was completed in, excuse me, in 2017. And we moved in in that year around September. And in that first few months of having the building being substantially complete, there was a notable distresses that occurred in the wall right behind me, the east wall or the, yeah, east wall of the council chambers. There was cracking, there was other things going on, both on the interior and exterior of the wall. And we were able to bring some experts in to take elevation shots. A surveyor came in, Simpson engineers to look at it and we had other experts look at it as well and it appeared that the the wall was actually sinking and so we were able to move forward with a remediation effort to install micropiles at the recommendation of a local geotechnical engineer, and that arrested part of the problem. In working with the contractor, the general contractor, or I should say not working with the general contractor of Meridian Construction, they did not stand by the construction that they performed, and we ended up getting into litigation regarding the construction of this building. And it wasn't just litigation with the general contractor. We also named the designer and construction manager, Architects West. We also had a supplemental project manager, owners rep, and inspector, 831 Consulting. They were also named, as was All West Construction Testing. So we moved forward for a variety of or for multiple years in litigation, and that was resolved at the end of last year, but only after the city council authorized staff to move forward with the initial repairs of the building. And we did that in two particular phases. Phase one was an evaluation of existing conditions, what's here, and that information was used to then plan out the actual repairs, which are phase two. Tonight we're here to talk to you about the next phase, which is phase three. So instead of going with the normal design bid build, which is what a typical project is done here in the state of Washington where as a governmental entity we are stuck with a low bid there are alternate delivery methods available to jurisdictions to utilize but it takes pre-planning and so we knew we didn't want to get into the same situation that we got into before with a low bid that cut corners at every opportunity plus we also had a situation where we had brought in experts from Seattle to take a look at their forensics experts, so a forensic architect and a forensic structural engineer, but they can only do so much without tearing the building completely apart. So part of this process of moving forward for us, it was imperative that we had an investigation period, that we were able to deconstruct part of the building, learn all the different efficiencies and then design repairs to those [P1: So] that's what's called a progressive design build process we went through the state process to get authorized for this jurisdiction to utilize that type of process and then went through a request for proposal and selected GARCO and we really appreciated that they came on board and over the next year and a half from that time completed at the end of 2024 [P1: did] a fantastic job putting the majority of this building this this room was actually gutted and rebuilt and they did it in a very expert manner that I think is in better condition now than it was when it was obviously when it was brand new but did a great job you can't even tell the difference between [unclear] between what was here originally and and now except of course those that know what they're talking about know it's in much better condition but um they were able to get the original bricks remanufactured another run made you can't really tell the difference between the colors i mean just a fantastic job that they've done so now we're at a point where from the end of last year, this entire year, we were working with GARCO on what the next stage of the repairs are. We actually paused those because we wanted to work on settling with the insurance companies and making sure that we didn't get into a situation where we were spending more than we were going to recover. So at the end of the litigation, we went into mediation, and that was solved and mediated about this time last year. And the settlement was $13.925 million in total with both Meridian's insurance company, Architects West's insurance company, 831's insurance company, and All West Testings insurance company. So all the insurance companies participated in that settlement. to put that in context the original cost of this building including purchasing the property and the design efforts to it was right around 14 million dollars so we came very close to having the original purchase price paid for however there was an additional six million dollars that the council authorized during this reconstruction phase but that reconstruction [P1: phase] really helped us get to a point where we could settle the lawsuit because we knew all the deficiencies in this building. So from that point, knowing that we had this settlement in hand, then we worked with GARCO on the next phase of repairs, and that's what we're going to be talking to you about tonight. I'll turn it over to Glenn to speak more about where we're going, and then Clancy, feel free to jump in whenever you want. This has been a really strong team effort, and I really want to thank Clancy for not just being the contractor here, but he's actually been an advocate for the city, working with his own team, and for all the different subcontractors on this as well to bring forward the most practical repairs that can be made here at this time. So, Glenn?
0:27:05 Senior Engineer Glenn Ritter [attribution disputed across passes]
Yeah, thank you, John. I'll briefly go through the list, and if Johnny could bring up the first slide there. This is the entire list of items that we're going to be discussing tonight, and if you can go to the first slide on the photos. The first item is the multi-story storefronts. We have five of those that exceed the height recommended for a storefront system. So we are going to replace these five. There's two here on the south elevation, two I believe on the west elevation, and then one on the north elevation. Those five would be replaced with curtain wall systems. Much sturdier, probably what they should have been designed and installed to begin with. The next item is glulam beams, and we'll talk about the interior glulam beams and the exterior. This is a document from the litigation that shows in red the 13, this is, I forget, this is the top of the first floor or the bottom of the second floor, so supporting the second floor. This shows the glulam beams in red that litigation recommended, that there are experts through litigation recommended be replaced. Next slide, please. This is now the second floor looking up at the third floor shows additional glulam beams in red to be replaced, although we're going to repair them. And last slide, please. This is the roof or the top of the third floor. So again, the 13 shown in red, we will be repairing instead of replacing. As you can imagine, the replacement of a glulam beam would be very cost prohibitive. So we, GARCO, engaged an expert in glulam beam repairs from Southern California, and they're going to come in and drill and repair these with drilled epoxy threaded rods. So they're going to drill the holes through the bottom of the beams and inject pressure epoxy into the crack areas, which will essentially repair the beams to the existing condition. This will all be certified by a structural engineer, so rather than replacing these 13, we will have them repaired.
0:29:33 Unidentified speaker [?]
In addition,
0:29:34 Senior Engineer Glenn Ritter [attribution disputed across passes]
and again, some are on the interior, some are on the exterior. In addition, you've all seen the cracking, the checking, it's called, in some of the beams. Those will be filled with caulking, and so they'll be sealed up, and you probably will not even notice, but it will make the crack go away. And those items are not structural, don't require they weren't scheduled to be replaced, so it's more of a cosmetic repair. And so those are items two and three for the glulam beams. Item four is attic venting and insulation repairs. There's no picture for this, but essentially the insulation in the attics, both the north wing and the south wing, was deficient. The baffles and the venting was deficient, so GARCO's got a subcontractor that will come in, fix the baffles and the venting, and blow in additional insulation. but they will also add some thickness to that insulation to give us a little higher [unclear] value to meet the current washington state code next item is window repairs this is pretty substantial again no pictures but you all are familiar with how many windows we have in this building quite a few in fact we have 120 window systems that need to be re-cocked the seals around them were not installed properly and so GARCO subcontractor will come in and re-cock all 120 window systems we also have 40 or so operable vents or operable windows they're going to remove those were not constructed properly either so GARCO subcontractor will remove those take them back to their shop repair them and then come back and replace them the re -cocking is going to take quite some time because they have to remove the existing caulking and reinstall that on again basically every window except for the storefronts that I showed you to be replaced so I think we estimate about potentially two guys and we want to have the same two guys doing it so there's you know no no change in quality and no overlap and so they're going to basically be here for up to six months, I think, potentially, and they'll start that work in the spring. So I think that's it for the window repairs. Next one is shown on the screen here is the two small metal roofs on the west elevation. These were not installed properly either, and so GARCO's subcontractor will come in and repair these metal roofs and make sure they're installed properly. It involves cutting some edges into the brick, resealing, re-caulking, fixing gutters, and downspouts for these two metal roofs. The next item is not a litigation-related item, but it is a necessary security improvement for the building, specifically the first floor. This is the design Garko came up with working with us, and Jenny was working with the entire staff on the first floor. I worked with the staff on the second floor [unclear] what this does is it's going to reconstruct the permit counter. And what that will mean is there will be a glass barrier to prevent somebody from entering, jumping over the counter and entering into the employee area. As you know, that employee area opens up directly to the second floor where you have even more employees. So this will essentially prevent somebody from being able to just jump the counter and come in to the employee work area. If you'd show the next elevation, we're going to basically rebuild everything west, excuse me, yeah, everything west of the reception counter. So basically this area will all be rebuilt. We will add shatterproof glass. It will not be bulletproof glass, but it is shatterproof. There'll be some speaker holes as well as an area to be able to slide plans through at the bottom of the glass. Let's see. I think the next slide would show from the staff side. One of the other things that we're [unclear] to do. [unclear] of the other things that we're doing while we're doing all this work is we're going to improve the ergonomics for the permit counter staff that work in the area. There's three permanent employees where their workstations are there full-time, and then there'll be two drop-in counters for other staff to come forward as needed. Yeah, very important from a safety standpoint with all the employees that we've spoken with. Is there anything you'd like to add to that, Jenny?
0:34:42 Building Official Jenny Nickerson
Well, from the permit center perspective, I know that there are some concerns from staff about ensuring that we're able to keep the quality customer service that we're known for in the permit center. And although I'll admit none of us really want to make a security improvement or have any physical barrier between us and our customers, we also understand that safety is a high priority. [P1: and] improving our level of safety, not just on our first floor for our permit center staff, but also, as Glenn mentioned, for our second floor staff is important. So that if a person decides to come into City Hall with ill intentions, that we can reasonably defend ourselves against an attack. We also know that it's important to be careful and mindful of our elderly citizens, our customers who are hard of hearing or may have a language barrier. So we've talked about strategies as a group of staff to make sure that we can take those customers that would benefit and really be interested in that one-on-one service that we're known for. We can pull them into a conference room. IT has all of our conference rooms outfitted with full capabilities, just the same capabilities we have at the front counter. So we do have some wonderful breakout spaces available to us.
0:36:00 Senior Engineer Glenn Ritter
Yeah, thank you, Jenny.
0:36:03 Unidentified speaker E [earlier-pass label: John Hohman; unconfirmed]
Do you have anything else to add on that well not on that specifically i just think as you're going through and as you see these nine or ten items as john said design the the progressive design build process has really given us the opportunity to spend the last year looking at all of these items individually and doing additional site investigation while we're here you know when we were in in this room here it gave us the opportunity to see how the building functioned to see some of the deficiencies that were [P1: noticed] noted, and then also do additional exploration, whether it's up in the attic spaces, whether it's the windows, and also bring in some of the experts that we work with in the community, subcontractors that have been very valuable to providing a fantastic product for the [P1: Valley] at the end of this. So all of these items we've rinsed and repeat and look and see what is the best way of means and methods to look at from a fiduciary standpoint. How do we go about solving some of these corrections that were necessary? And it's been a collective collaboration that's been really impressive to be a part of. Thank you.
0:37:15 Senior Engineer Glenn Ritter [attribution disputed across passes]
We'll move on with some other security issues. Another security item that we're going to address is access control on the first and third floor, the restrooms. So we will be adding access control to those restrooms. It'll be programmable so that we can set that for card reader access only when we desire, particularly during meetings. or what have you. Additionally, we'll add a [unclear] we'll add a [unclear] we'll add a door on the second floor over by the drinking fountains. That'll close off the area to the kitchen and the restrooms on the second floor. So that'll be secure, essentially creating secure lobbies on all three floors so that the public can't get into the employee areas unless. they're invited in or have access another safety item is at the chambers and the chambers in the east entry we're going to apply a safety film think of it as the like safety glass in your car but this can be put on rather than in between the panes of glass during initial installation this can be this can be applied after the fact and so we would do it at the lower levels of all the windows all along the north wall here the east wall and again the east entry just for a note [unclear] after GARCO finished construction of this chambers, somebody threw a rock from sprague through the window, and it just came right through. So the safety film will prevent that from happening and prevent the glass from shattering. Another safety item is fairly minimal, but we have attic access issues on both the north and south wing. They were not installed properly, kind of after the fact, but this is necessary for our maintenance staff to be able to get up to the act, to be able to access the attics when needed. And lastly, we have a, oh, sorry, thank you, Johnny. So that was the door on the second floor. If you could go to the next one. I was reading right along here and not looking at my own pictures. So this is a new office on the second floor that essentially will expand engineering area and relocate the existing IT manager to the new red area just to the north there. The door at the south of engineering into IT, the interior door there was slated to be repaired anyway for the deficient framing. And so we will move that door rather than repair it in place. We'll move that door to the north a little bit. And that is the... [unclear] that is the... end of the list of items we are going to provide for sufficient contingency in the authorization for agarco's change order as you know in a remodel or any rework on an existing building you start opening up walls you find surprises what have you that we can address with the additional funds and then lastly there is future work that would need to be done that's not included in this list. That includes the HVAC system and HVAC systems and roof replacements. But those would be done at the end of their useful lives with some of the additional funding, I believe, is the plan.
0:40:49 City Manager John Hohman
That would be the plan. So you may ask, is this the best way to do all this work? And I firmly believe that it is the best way to continue working with GARCO on the progressive design build. As you've heard, we have worked over the last year to put this scope together. One of the benefits that GARCO brings is that they have in-house architects, so it's not an extra expenditure. In this case of the diagram that's up on the wall, I understand there's some concern about this isn't really repair, it would be something new. It really wouldn't make any sense to separate this particular item out and go hire an architect, a separate architect to design this new office space and then go back and bid that out. We already have an existing agreement with GARCO. It is a time and materials plus 5% profit, so they took a very reasonable approach to our initial overall master agreement with them on this. And it just makes sense to execute this work now and would save a lot of money in the future with this process. As you heard, one of the existing doors is already deficient, so that needs to come down and be rebuilt anyway [P1: So] it just makes sense to move that a little bit the other part is is that our IT manager has been his office was a storage room with no ventilation whatsoever in it so it just had computer equipment in it before he's had to suffer through the the winters and summers and part of this cost will be to fix the the HVAC system to connect up to that space as well so we're here [unclear] we can answer any questions you may have we really appreciate Clancy being here because he's able to answer any very technical issues that you may have or technical questions you may have regarding any of these items or any of the work that's been done to date so far under the phase one and phase two
0:43:05 Councilmember Ben Wick
yeah I really appreciate the presentation in the thoroughness of all of these fixes [unclear] think getting it so we don't have to replace a glue lamb beam i can only imagine how expensive that would have been and so really appreciate all of the efforts as you go through to figure out how we can best achieve this by while still ensuring the integrity of the building and so really appreciate that um as we get through this and and i have no concern about how we're approaching this so i think you say with garko already being on site already getting into the building it only makes sense to have them kind of do some of these other things [unclear] as we need for the building i think there's a economies of scale and everything else there of not getting in one contractor getting in the way of another contractor and the delays and things of that nature so totally get our process on this my kind of questions come on the a some concern or shared concern around the security for the permit counter i i wholeheartedly agree that we need to make sure that we're providing a safe working environment. But I'm concerned about the customer service. I mean, we're very known, I mean, around the state and beyond, I think, for our customer service level, for permitting especially. And so I'm just a little bit concerned about having the new face of you walk into City Hall and everybody's behind glass so i'm a little a little concerned about that um i know i know that our team is going to do everything they can to continue to be excellent customer service but i didn't know if there was other other options or anything else that you looked at to try and i just hate i mean usually i'm kind of rambling a little bit but we've gone to online permit permitting. We have a lot of people that do the online, but usually it's the people that are frustrated that maybe have a little bit of a language barrier. They're coming into City Hall. And so just want to maybe talk a little bit more about that. Or is there a way to have reception at least not be behind glass or somebody? I just hate for the first experience with city staff is behind glass.
0:45:25 City Manager John Hohman
So if I may, I'll give you a little bit of background on this piece. So we had an incident a couple of years ago. I think it was a couple of years ago. I don't really remember exactly when. But we had an individual come in, very disruptive, ended up making their way into the men's restroom and up into the ceiling. A number of us staff members confronted this individual, and one of our teammates here wrestled with him a little bit, and he got loose and ended up getting out of our building and going into Wells Fargo and making quite a scene over there before the police were able to respond. That led us as well as I think this building is very exposed and very inviting, and that was part of the design effort as we wanted to make sure that it was very inviting to the public. Well, it's inviting to everybody, and I think we can all say that unfortunately our world has changed quite a bit over the last decade and not necessarily for the best. So we embarked on bringing in an outside safety consultant, so the former police chief of Liberty Lake, who now is the security lead for Central Valley School District, so he came in and did an assessment, provided some recommendations for us. He got really busy on a variety of things, so we were able to bring in former police chief Mark Werner. from the Valley PD, and he completed that work and provided some staff training. And all through that, those individuals were able to work with staff. And, again, I think Jenny sums it up. I think we wish the world wasn't the way that it is right now and that we didn't have to do anything on the public counter. But especially for me, being responsible for the welfare of the employees here, I've had enough one-on-one conversations with the majority of the staff that feel that changes are necessary and need to be done. That being said, we have gone through iteration after iteration and meeting after meeting with the staff to come up with the plan that you see here. Because it's a design build, it doesn't mean that we are finished iterating. We can continue to look at things to try to make it as customer-friendly as possible. As you know, that was my initial task when I was promoted to director in 2011, was to fix the permit process and make sure that we are at the forefront of customer service, and I still take that very personally to this day. So I guess what I would say is that we've put a lot of effort in to study this. We've worked with a lot of different people to try to come up with an adequate design. We can continue to do so, but I do feel strongly that something needs to happen there to be able to make a safe environment for employees to not be afraid coming to work. And if they're afraid coming to work, then they'll find someplace else to work. And I think as you go from government building to government building in this region, you'll see that hardly any of them are so open like we are anymore. You go to DOT's main office, and they've always had the individuals behind glass, and that's actually bullet-resistant glass that you're speaking to them from. City of Spokane has shut things off. The county is a lot more restrictive than they used to be. So I just think, unfortunately, it's kind of the way of where we're at. But your concerns are noted, and I think we will continue to look at that.
0:49:28 Unidentified speaker E [earlier-pass label: John Hohman; unconfirmed]
Clancy, I know you guys spent a lot of time looking at this issue, too, and do you have any thoughts? Well, I would say that, you know, from the original design that we put together on this, we tried to reduce the massing of the dividers in between the two to give a little bit more of that transparency and light through while still giving each individual that sense of privateness when they're working from the permitting perspective. There's not a great solution to create a physical barrier without the glazing, the glass, but I think it does at least give that opportunity for the natural light from what would be the south side coming through the process. [unclear] maybe we should have shown the first couple renditions where those were just you know five foot partitions all the way up to the up to the ceiling that really did kind of make him seem kind of like corridors pretty narrow corridors to where we're tried to really open it up at this process and I think as Jenny mentioned this provides an initial protection for staff
0:50:34 City Manager John Hohman
but say an individual that is hearing impaired or is not a threat as staff determines and needs that assistance we do have the lobby tables and maybe we can look at setting up a more permanent space where the assessors usually have their portable table maybe we can put a workstation there that as long as staff assesses that there's not a security concern with that individual that we can we can have those one-on-one discussions [P1: The] other thing is too is that we have a variety of conference rooms that are available on the first floor that we use quite frequently and so that could be another thing that we would pull the individuals off of the out of the lobby themselves and and have those one-on-one discussions on within the conference room themselves so I think we have a lot of options the one thing that I really appreciate this building is functionally it works extremely well. We did spend extra effort in the design and layout and it has been a tremendous success from the efficiency of our operations and we do want to be very mindful not to disturb that too much.
0:51:51 Councilmember Jessica Yaeger
Councilmember Yaeger. Thank you. So I'm wondering if with Councilman Wick's concern if there's a way that we can put like anti-glare on those so you're not hit with something on a sunny day when you first walk in [P1: you] know like your eyeglasses or something or I don't know something that's more aesthetic but am fully supportive of of this glass because the the safety of our staff is paramount to anything and i think when you do walk up to something that has glass it's it's how you're received and if they feel happy and secure in their spot, they're going to receive our clients well. So I'm just wondering if there's like an anti-glare that we could put on maybe at least the initial east side reception.
0:52:45 Unidentified speaker E
That's a great idea for us to look at. We can do a solar study as well because we've got this in a model [unclear] we can run it through the different time frames to see where those potential glare locations could potentially be and that might be on that on the east entry portion where you get the most likelihood
0:53:05 Councilmember Ben Wick
of that being the case [unclear] we can definitely take a look at that councilmember wick yeah and I don't get me wrong I agree that we should do something it's just what that something is I think we and I appreciate the fact that we could still I know in this process we can still talk about this a little bit more and would really appreciate maybe spending a little bit more time to dive into this element of it so I'm not sure we need to do anything different or just really want to encourage us to have a little bit more of a conversation and maybe the maybe the permit center I know they're very excited about the expanded desk space as well and so and I get that and I can see that but maybe it's just focused on reception or something just trying to have that initial thought of contact with somebody to being make sure that it's clear and open versus guarded
0:54:01 Unidentified speaker E
I think at the reception area [unclear] without it without a doubt that's an opportunity we still have time I think what we're trying to do through this process is if the decision is to move forward is to get the casework built off-site and to start that during this you know this but January February time frame so that when we do come in we're basically in position to remove the existing plug-and-play almost for the most part and bring in the those dividers and those actual sections but as far as what we're doing at the reception area that all stays in place and that's more just that glass so we can still look at solutions
0:54:42 Councilmember Jessica Yaeger
councilmember Yeager thank you so if I'm binge watching anything it's home renovation shows and I've seen how they go to hell in a hand basket so this 20 contingency with the history of our building, is that enough?
0:55:03 Unidentified speaker E
Like, I'm just afraid y'all are going to get in there and go, holy cow, what is this? Yeah, it's more than enough. I mean, it's more than fair. We've spent a significant amount of time in and around this building. I would say that the attic spaces would be an area of concern had we not been running around up there for the last year taking a look at the issues. I think a lot of the things that we did on the exterior, from the temporary measures we did on the first portion with some of the roof locations where we had leaks, where we had dissimilar materials coming together. And fixing those areas had led us to more security with where we're at with that attic space as well. But this room we're in would have been the most concern from a contingency perspective. The other thing is, within each one of these numbers, we are taking it at the worst case scenario. [unclear] as John had said we this is a cost plus with a fixed fee for a determined fee so we want to make sure that we have those contingencies within the goal is ultimately to bring as much of that money back as we can but we have with the decisions that we've made in each one of these areas we have some minor contingencies built in from that perspective to make sure that any unforeseen that we would run into we've got covered thank you and I just wanted to add to just came to my head thought a
0:56:43 City Manager John Hohman
conversation that Clancy and I had last week about this particular building and I want to assure the council and the community that yes we had the settlement issues that led to this and this is my point probably being the most studied building in eastern washington we had the initial 2 000 page report plus five addendums and those all served us really well during the litigation portion and then started the process that we've been through for this last year to vet through all that and come up with unique practical solutions to each one of those items so when we talk about all these deficiencies I don't want to leave you or the community with the thought that there's something inherently wrong with this building yes there was parts of it that needed to be rebuilt and reconstructed and repaired and we have been diligently working on that moving forward. But the structure itself is secure. I know, you know, years ago when all this started that there was a lot of community concern about it falling down. And there was one day that a family member of mine, it might have been my wife, called me up and said, yeah, I just heard that the city hall fell down and it's on fire. And I'm like, gosh, [P1: I] hope not i'm on the third floor um but there was a lot of talk and and um conspiracy theories about things but um maybe clancy you can
0:58:21 Unidentified speaker E
assure the council and the community that you've studied this in depth and you feel very um secure about well not just me you would want something more than me for sure we've got engineers etc that have taken a look at this uh i think that the easiest way to put is that there are flaws there were flaws with the building itself but this is not a flawed building by any means and when we walk away from here we're gonna make sure that we're comfortable it that we're leaving this for generations to come any
0:58:51 Mayor Pam Haley
other questions comments from the public I'm
0:59:02 Public commenter: Donna Shepherd (name as heard)
the one that emailed all you guys yesterday if you actually opened them my name is Donna Shepherd and I've been in the valley I've been living in valley 45 50 years so I appreciate the history lesson of all the building and I can respect the relationship that you guys have but you're still glossing over there's a lot of new construction on that list and I still think you need to follow the procedure even if it's just to do a gut check to see if the bid is in line you still need to do it you're spending taxpayer money and you need to follow the process. Thanks.
0:59:42 Mayor Pam Haley
Thank you. Is there anyone else who wishes to comment?
0:59:52 Unidentified speaker C
Ben Lund, and first of all, thank you, Carco, for fixing our building. I think it's really important. And I think we have a trust issue. And I'm not an engineer talking to me about flooring. I clean carpets. And I can really help you out with that. But all the rest of this stuff, I don't think anybody in the house, except for people sitting at the table, really have know what's best for us and I think it's very common sense not to add money by procedural things, but to help save us some money and give us a better working building and a more secure building and I think sir you made a great [P1: comment] that we want this building for generations and [P1: we] had some problems going into it but we need to fix the problems and make them right at the most cost effective way to do that not procedural. A lot of times procedural will add lots of time, lots of issues and in my opinion I think they've done a great job isolating what we need to do now, how we need to fix it up at the lowest price for us and I really appreciated not having the glass when we walk in. Been refreshing if you want to talk to somebody that you don't have to talk through something here, but you know the fact is that's not the world we live in today. We see lots of videos of even in courts of people, bad actors doing their thing. I'm really sad about that but I think we can manage that and we can come up with. ways that the staff does a great job and there might be a few things they might have to tweak in the approaches that we have but I'm very confident that we can figure it out and I trust the staff and they trust our our our care for our community and the care for our budget thank you any other comments from the public just
1:02:23 Unidentified speaker E
just one comment with regards to from a from a pricing check perspective a couple things first of all we do many of these most of this work of this two plus million dollars is done by subcontractors we we check subcontractor pricing there are certain more areas like for instance the glue lambs we went through five or six different renditions with five or six different types of methods we found the Southern California company and went through a process that we would say if we were going to either put structural steel up which was one of our ideas which GARCO would do would have cost twice what we're looking at at this point if we had to remove them and [P1: replace] them in like we couldn't really put a number to that just because of the invasiveness of each one of the locations so we have done the due diligence from a pricing perspective in a lot of these the other I would say there are certain spec aspects like the glazing for instance where we started with a contractor we bid that originally when we did this first portion we've stayed with them because of their due diligence the work that they've done that they've provided and their pricing has been per square foot similar to where they were beforehand and part of that we're we're using their trust and their input that they've provided and part of that's been we're not going to remove all of these as one of the options were to do we're going to fix what we can to save that money through the process comments from the public
1:03:57 Unidentified speaker [?]
[unclear] Rock the Valley,
1:04:02 Public commenter (name not captured)
it's my understanding that we had a free building. The property and the building originally was $14 million. And we had a settlement of $13.9 million. That almost balances out to a free building. Is that right or wrong? Am I thinking wrong on that?
1:04:28 City Manager John Hohman
Correct me. It's not really free, no.
1:04:32 Public commenter (name not captured)
Well, anyway, we got that money back, right? Because it had to be reinvested in fixing the building. Is that what you're saying? I thought the insurance company fixed the building.
1:04:42 City Manager John Hohman
We are in the process of fixing the building.
1:04:46 Public commenter (name not captured)
To clarify my comments, we have sufficient funds to fix it properly. Right. And so any additional amount that we go in for improvements, that is not going to be near the humongous cost. We are actually saving money. Yes, we're not spending nearly what we normally would have to have this done originally. We're saving it. we're in good shape happiness all the way around is there anyone else who wishes to comment no
1:05:29 City Manager John Hohman
I'm sorry just once comments from council councilmember wick I just see mr. homer with his hands up I just wanted to respond to one of those public comments so I wanted to reiterate what I already said which was we went through a progressive design process which is an approved alternative design method of construction approved by the state of Washington we went through that process were approved for that process that's how the initial work items were done we are continuing that contract because it's still in place and this is the most efficient and cost-effective means of conducting the repairs that are here plus the very minor items that are included that I guess we would call a betterment but it's a betterment because of the changes that have occurred in our environment over the last decade since this has been designed
1:06:32 Councilmember Ben Wick
councilmember Wick yeah I would just add to that that in that progressive design process it was an open process I believe it was an RFQ or something of that major one of the RFS that we did as a public process that we ultimately selected GARCO construction but it wasn't that we went out and said garko's the one doing it we had an open process through there where any of the contractors could have submitted into that we didn't really know the full extent of the repairs that we were needing to do at the building at the time we selected garko they helped us through that and identifying and it's been a multi-year process as we continue to identify different repairs that need to be made so i feel like every contractor had an ability to apply for this i am happy that I mean, no construction project kind of maintains that same pricing level for multiple years, and so I appreciate the fact that we're able to kind of extend that same model from a couple years ago to continue this project into another phase, so I do appreciate that as well. And while it sounds like the building is free, we had already invested $6 million in repairs and looking at another two, and so nothing's ever free, but it does at least provide us the ability to make these repairs
1:07:49 Councilmember Jessica Yaeger
councilmember yeager thank you well i just appreciate you guys knowing this building inside and out in order to make me feel safe sitting here because i'm looking at you know going are those beams in here but i know that you guys are considering safety and the longevity of this building for many years to come which you know it's it's really important that you guys know this so well and um i just appreciate you guys bringing this to us so that we can help make it [unclear] safer all the way around and uh kind of patched back together so thank you deputy mayor hattenberg yes i'd like to concur with concur with remarks by uh councilmember
1:08:30 Deputy Mayor Tim Hattenburg
wick and yanger uh they must have been looking at my notes but we did go the day after we approved the work order for uh garco i was delivering something at gharco on the broadway and i spoke to one of the engineers and another person who'd be working on this project and i wasn't there as myself i just said this i happen to be on the council but i want to let you know that we're really excited they go you don't know how excited we are we live in the valley too we were proud of the work we wanted to be proud of the building when we do the design they were really happy really sincere and also our city manager and our staff took a bold step when they decided that came to council we approved it to start repairing this why we're in litigation we could have waited we'd be years behind and probably probably more money behind also so i just want to compliment them and knowing garco was on board and with what council member wick said for the second part of this phase and there was a public uh people could have applied or whatever submitted proposals we chose them again and i also want to mention it's been years ago lancy you were probably a great school boy i used to work with such a high school district but we worked with garco throughout the central high school district for various projects whether it be athletic fields or you know building construction they always do great work and i'm just saying that from experience i'm happy to have you as a neighbor also working on this building Thank you.
1:09:57 Mayor Pam Haley
And I did talk to the first floor, a few people on the first floor about, and my understanding is that it was actually unanimous to, for this design when they voted. The other thing is right now we have a really brave receptionist, but two things. She's not always there. She has to go to lunch. She has to take breaks, and that puts different people up there. And say she wants a promotion and moves up somewhere in the city, that's going to put somebody else there too. And we would be, I think, really wrong to not build it the way we know it's safe just so that it stays that way, right? we don't want to come back a year later and go oh that's great she's upstairs now but we need to put in glass so i think this makes the most sense all those in favor aye opposed motion passes unanimously thank you thank you merry christmas merry christmas jinx
1:11:01 Mayor Pam Haley
so up next we move on to our non-action items and we have a report on the kratom discussion with Kaitlin Purdy, Chief Ellis, and I'm going to try your name, Lieutenant. We'll see how I do. Lieutenant Rob Sataki.
1:11:20 Mayor Pam Haley
Mayor, Deputy Mayor, Members of Council, Chief Dave Ellis, Spokane Valley Police Department. I'm joined by Kaitlin Purdy from the City Attorney's Office, Lieutenant Rob Sataki from Spokane Valley PD's Special Spokane Valley Investigative Unit, or SBIU. We're here to discuss the drug Kratom. This is something that was brought to our attention via Representative Suzanne Schmidt. We met, John Holman and I met with Suzanne recently, and she expressed her concerns about this drug. It's also something that has been brought up by Council Member Padden requesting more information. So we've come before you to give you a little bit of an overview of the drug and then also some options for regulation. And with that, I will turn it over to Lieutenant Sataki.
1:12:06 Unidentified speaker F
Thank you for inviting us. So tonight we're just going to cover kind of what is kratom, how is it used, what are the effects, what are the local legalities, what's our authority to regulate, and kind of what our options are. So to start us off, kratom is actually a plant out of Southeast Asia. The leaves are taken and processed, and we get a couple different psychoactive ingredients out of it. The main ones are mitraganine and 7-hydroxymitraganine. Those are the active alkaloids that they use to cause euphoric feelings or anything like that. There's a bunch of different types and things they can do to process it. It comes up in powders, teas. They take the powders and put them in capsules. There's extracts that go into all kinds of different items, such as gummies, energy drinks, energy shots, all kinds of different forms of ingestion. [unclear] so as you can see here it's also popular to mix with cbd in our cannabis shops locally you see it marketed there many times as well in the edibles department gummy bears things that look like candy um they're sold pretty regularly at the at your convenience stores you know if they're sitting up there by the counter and they look like a bunch of gummy bears and they're non-regulated anybody can buy them sometimes we have young folks using that kind of stuff so kratom is kind of a weird substance in itself in low doses we see it act as like a stimulant a pick-me-up somebody to get something to give you a little bit of energy in high doses we will see it act more like an opioid where people get calmed down [unclear] get very relaxed they go on the nod just like we see within fentanyl people get really lethargic so it starts to work quick and can last we don't know how long there's not enough studies on it there's not enough research into it to see when it [unclear] when And it peaks and starts lessening in anybody that takes it. We do know the more you take, the stronger the effects.
1:14:47 Unidentified speaker F
So there's been a lot of different effects I've just talked about basically from it. But we have seen in high doses a lot of psychosis, delusions, hearing and seeing things that aren't there. We have a lot of problems in our society anyway with the methamphetamine and people hallucinating and seeing a lot of things, but then you add on to another substance that compounds it as well that doesn't make it any better. the common side effects they were kind of what you expected they run the gambit for each person as I said there's not enough studies on it to know traditionally what set side effects for everybody is going to be so it seems like everybody comes up with a little thing different whatever happens to them they react a little bit differently to it it does as I said earlier it does compound the effects of other things going on with the body and also can work into if you are naturally predisposed to high blood pressure or anything like that it can exacerbate the situation and so there's no FDA regulations or anything of that on it at it at this time we have seen in pregnancies people being born addicted to the substance. It's, when I said it acts like an opioid, it actually binds to the same receptors that opioids would bind to in the body. And when that happens, you get similar effects. And also, the more they take, the more addicting it becomes. And those that become addicted to it often end up on the same opioid withdrawal and removal programs, such as Suboxone and treatment centers and anything of that nature. In the last five years, or not last five years, excuse me, 2014, 2019, poison control centers kind of, they field about 3,400 different reports and seeing these things come in. All kinds of different things to people believing they were overdosing on it, to bad effects in their body, to their health, feeling like they were being poisoned. There hasn't been anything that says it takes this much to overdose, or what an overdose looks like on Kratom. We find it quite frequently, we call it a polysubstance. so it usually shows up in the system along with something else, such as amphetamines, fentanyl, norfentanyl, other opioids, other forms of ingestion.
1:17:44 Unidentified speaker F
So it's been used quite frequently as kind of an economical and cheaper option to get off of opioids, but like I said earlier, you run the risk of the more you use it, the more you need to use and you end up with the same type of addiction that you do with opioids so they're right back to square one trying to go back into those programs to get off a substance that is unregulated and doing things to their body that we don't quite understand yet due to lack of studies on it um it has been seen that that with no no regulations on it there's no mandatory testing, so we don't know what are in these substances, what the strength of those substances are, what's a recommended dose, what happens if you take more than that recommended dose. We've seen heavy metals come out in them, and there have been linked to about 34 deaths from salmonella.
1:18:47 Unidentified speaker [?]
Those are documented.
1:18:51 Unidentified speaker F
So the federal response, the DEA at one point tried to classify [P1: it] as a controlled substance. That did not go through, but they have listed it as a drug of concern. The FDA, like I said, hasn't done enough studies on it to see what the actual effects are. They've recommended that people do not use it due to out of concern for unregulation on it and what it does to people so in the United States it has not been shown to be to treat any kind of medical necessity or anything of that nature or have any kind of health benefits that a lot of other things do that are looked into so we we see it like I said sold a lot in our cannabis shops any of our convenience stores have them. To be honest, I'd never really looked around them much. The more I started researching this, the more I realized you walk up to the counter to buy your soda and there's always Kratom sitting there. And the more I drive down the road, I see a lot of convenience stores are flashing Kratom for sale here, Kratom for sale there. You know, it's all different, and it's all unregulated and not the safest substance I've ever seen. We do have a couple documented local cases. They are, we had in June, July of this year, we had two deaths. The Spokane County Medical Examiner's Office does not routinely test for mitraganine or 7-hydroxy mitraganine. [unclear] are extra tests toxicology tests they have to add on at an expense to the medical examiner's office and right now they do not have any grant money or extra funding from the county to test everyone for that it just so happened in these two cases that they were they tested for I don't know why but they did come back with kratom in there like I said with other substances mixed in with it. So the overdose deaths were not attributed to Kratom alone, but they were in combination with other substances.
1:21:23 Unidentified speaker F
From my research going into it, there's seven other states that currently ban it in different forms or different regulations of somehow. They regulate it somehow. There's numerous other municipalities throughout the other states that do have some kind of regulation, some kind of banning. Right now, the city of Spokane is also looking at a ban. I have not read what they've got. I've got some feelers out to some of these other local jurisdictions like Cle Elam and a couple of the other states to see what [P1: I] can get back on what actually their regulations are and how they went about it
1:22:13 Councilmember Ben Wick
thank you caitlin prunty deputy city attorney i'm going to be touching on some regulatory options for council to consider starting with the city's authority to regulate lieutenant sataki mentioned there are no federal or state regulations at this time and the city has authority to regulate the sale of kratom through its police powers granted by the washington constitution and then for the further enumerated in the rcws to protect public health and safety and
1:22:54 Councilmember Ben Wick
one of there are a couple of different options for regulation the main one being a prohibition on sale and distribution which could include multiple enforcement options [P1: including] a civil infraction or misdemeanor or a combination of both and as well as a provision that provides for the revocation or denial of business licenses for retailers who are found in violation and in order to be effective from a health and safety standpoint a prohibition on sale would likely include any products that contain kratom or any of the psychoactive alkaloids, the 7-hydroxymitragynine and mitragynine, including synthetic forms of those alkaloids.
1:23:53 Councilmember Ben Wick
Currently, as Lieutenant Sataki mentioned, there are two jurisdictions in Washington that are currently addressing Kratom. Cleelum City Council passed a six-month moratorium in October 2025 that banned the sale of Kratom while council evaluated permanent control. And shortly thereafter, Cleelum City Council did vote to move forward with a permanent ban in November of 2025. I don't think the version of the ordinance that will be permanent has gone in front of Kaleelum City Council yet. Likewise, same thing in Spokane. I don't believe a draft ordinance has gone in front of Spokane City Council. However, there was a presentation on Kratom before the Public Safety and Community Health Committee at the beginning of this month. And we'll continue to keep an eye on that in an effort to be cohesive since we are so close. The The first penalty option for prohibiting sale of Kratom in Spokane Valley would be a civil infraction. This is a not criminal. It's typically a monetary penalty [P1: and] it can escalate for repeat offenders. Cleelum did issue a civil fine in their moratorium ordinance, and I'll show you an example of that in a moment. But again, we can also include a provision that provides for revocation or denial of business license upon issuance of a civil infraction. And here's an example of what Cleelum did just for the moratorium. I am not sure if this is what their permanent ordinance will look like [P1: but] you can see that the initial violation comes with a civil penalty in the amount of $250 and then jumps up to $1,000 for each subsequent violation and then every sale or distribution counts as an independent violation that is subject to that $1,000 fine.
1:26:11 Councilmember Ben Wick
the second option for regulation would be um a misdemeanor um the maximum criminal criminal penalty that the city could impose is a gross misdemeanor and that's a maximum of 364 days in jail and a maximum fine up to a five thousand dollars um council could also consider um a dual approach with civil infraction and then escalating up to a misdemeanor. However, misdemeanors do come with a much higher burden of proof and that is a significant enforcement consideration that the city would need to work with the county prosecutor closely to determine whether or not that would be an efficient form of enforcement. And we can talk a little bit about that at the end as well if you have questions and
1:27:10 Councilmember Ben Wick
then regardless of the the penalty framework that council chooses council will have to decide whether or not to prevent all kratom sales in Spokane Valley or limit it maybe just to sales to minors so that is a consideration as well to think about and then of course if we as we move forward with this process we are going to have to work with very closely with law enforcement and the county product prosecutors to make sure that our enforcement is effective and achievable and with that that's all we have for now and I'd like to open it up to questions and discussion questions [unclear] council deputy
1:28:05 Deputy Mayor Tim Hattenburg
mayor Hattenberg this is probably more of a comment but as a retired educator i would think this would probably be a i guess gateway drug as it would per se for youth and i'm really really concerned about that i did speak with some officials in the one of our school districts that are saying they're really seeing it as an issue it's so easy to obtain as you said lieutenant that any store you go by in almost every corner and i'm exaggerating little bit have they heavily advertised it so that's my main concern is how we could do that and keep it out of youth hands and or prevent it from being the gateway drug it is and then you know once you would know better [unclear] lieutenant that it's hard to get it back we lose it councilmember
1:28:47 Councilmember Ben Wick
[unclear] I noticed in your examples between Cle Elam and Spokane I didn't mention either of them just focusing on minors did they go after outright banning or did they just go after minors cleelum went for an outright ban i i'm not sure i haven't seen or a proposed ordinance hasn't been um shown to council yet so i don't know i'm assuming it's an all it's a all-out ban a
1:29:20 Councilmember Ben Wick
comment comments from council council member wick so you know i'm supportive of the outright ban, I think it's also easier to enforce than trying to enforce just the sale to minors as well. I personally prefer the civil infraction. I think we use that fairly effectively for our illicit massage parlors and trying to go after the, in my mind, an escalation up to the revoking of the business license, which then ultimately we could pursue that they shouldn't be in business in our city if they can't follow the laws. So I personally appreciate that approach.
1:29:58 Deputy Mayor Tim Hattenburg
Deputy Mayor Hattenberg. was I literally just going to say that. Whatever would be easiest for you to enforce. Maybe if you just went for minors, that would be a step, but then it doesn't address the whole problem, as Councilmember [unclear] just pointed out.
1:30:12 Mayor Pam Haley
[unclear] and I think it would be harder to enforce if it was just minors because how are you I mean that takes a lot more effort and it doesn't sound like it's good for anybody so I would definitely be in favor of a ban on the sales and I think that it does make sense that the business license be forfeited if they continue to sell it after they've been notified okay we're looking for consensus to bring this on a future agenda. Got it.
1:30:46 Unidentified speaker [?]
Thank you. Thank you. Thank you.
1:30:55 Mayor Pam Haley
That brings us to our second public comment opportunity. Same rules apply and
1:31:07 Mayor Pam Haley
no one has signed up but I will give a chance to anybody who has not commented during public comment to comment now if they would like to.
1:31:19 Mayor Pam Haley
Is there anybody who wishes to comment? Okay seeing none we'll move on to our advanced agenda does anyone have anything for the advanced agenda councilmember yaker um
1:31:37 Councilmember Jessica Yaeger
so the first one i have would be we've had um the scraps contract on this advanced agenda i feel like going on two years we're flirting with two years and i'd like to see about removing it i've had several conversations with people to include county commissioners and if we were to open that contract we're looking at you know three to five hundred thousand dollars more a year for that and i just don't feel like our staff need to be making that as a priority at this time until we're closer to our contract deputy
1:32:14 Deputy Mayor Tim Hattenburg
mayor hattenberg and may i ask city manager holman is that contract that runs through the current one 2033 is 2033 yes we have a current contract around the 2033 and my concern is as councilman reager pointed out hundreds at least thousands of dollars we could be responsible for if we open that contract before then and also speaking with people with scrap the during the pandemic they were having some problems they were having some problems with staffing issues they came before council and they they talked about it they addressed those and just remind people in our city that our contract is for animal control And I'm not being facetious when I make this remark at all, so please accept my apology in advance. It's not like they're there to provide for pet adoption as their main thing. Our contract is specifically animal control.
1:33:03 Mayor Pam Haley
Yes. Mr. Holman.
1:33:05 City Manager John Hohman
I just wanted to add some detail to the discussion, too. Spokane just recently entered into a revised agreement with Spokane County on scraps. So that is a model interlocal agreement that the county will be moving forward in the future. So Eric Lamb and Morgan Koudelka took a look at that methodology. And our current cost is set at, the only increase can be the CPI, so Consumer Price Index. And it currently is at $376,000. If we were under the methodology that Spokane just agreed to, that cost would go up to $855,000. So it's more than just a couple hundred thousand. But that's something that staff just looked at. Councilmember Wick?
1:34:06 Councilmember Ben Wick
I agree about the contract, not wanting to jeopardize the contract for animal control purposes. But I remember there was a secondary piece there, which was the advisory board, whether it's advisory or operational or whatever. We had a little bit of a conversation around who our appointments should be, whether it should be citizens or staff members. My recollection was also that we were going to have that kind of conversation and a part of this agenda item. Is that something that we should still be considering or thinking about? I'm not I'm not I'm all in favor of not wanting to jeopardize our contract but I thought there was other opportunities to work with scraps there is a technical advisory committee or at least there that's part of the interlocal I
1:34:54 City Manager John Hohman
know the county's been going through a selection process for a new executive director of scraps. So we can follow up with you on where that advisory committee is at. So if that's something that you would like to maybe narrow the scope of the item and just focus on that, that's entirely up to the council I'd
1:35:20 Councilmember Ben Wick
be more inclined okay
1:35:23 Mayor Pam Haley
let's see show of hands for what he just said and taking it off you're taking the rest of it off the advanced agenda thank you anything else for the advanced agenda council member Yeager I have someone anybody else have anything one thing I'd like for us to consider and
1:35:43 Councilmember Jessica Yaeger
I don't want this staff to think it's like the postage is pound more work on you but i would like to see like more like four times a year like a longer study session where we're kind of on the floor and talking through subjects not necessarily like all the presentations and like i don't want a ton of effort going into it but just to be able to kind of round table thoughts and ideas more but not put more work on staff i know i'm
1:36:14 Mayor Pam Haley
trying to describe an idea but so the only issue i see with that although i like the idea is that barcy would have a nervous breakdown
1:36:27 Mayor Pam Haley
[unclear] to keep track of all those conversations for minutes maybe what we should do is look into having more of those a roundtable discussion and setting that up as a separate meeting
1:36:42 Councilmember Jessica Yaeger
[unclear] would you be acceptable? I think that's kind of what I'm trying to say. Okay, perfect. Okay. I have one more.
1:36:53 Unidentified speaker [?]
What? I have one more.
1:36:55 Councilmember Jessica Yaeger
No, it's the end of the year. Lots of ideas. So speaking of fiduciary responsibility and the county, I would like to propose us looking at our public safety contract after speaking to Rod or hearing from Rod here I know gosh it was a month ago this has nothing to do with our police and our services that they provide us Dave's and his team has done an amazing job and I appreciate them so much but when I look at us being responsible for the dollars that we receive from taxpayers the public safety is one that we have very little control over and we're just expected to write checks and then I heard something else about something going on in the county that we're just expected to like give them 1.4 million dollars because they made a decision and I think it's time to start considering how much the county itself is going to give us versus what we're getting for it
1:38:07 Councilmember Jessica Yaeger
[unclear] just a question what are you asking for it to be on the agenda to like start studying what it would look like if we had more local control over our policing services records keeping if
1:38:24 Councilmember Jessica Yaeger
it was a better deal to have our own police department I don't know it's a big it's a big chunk to chew
1:38:35 Deputy Mayor Tim Hattenburg
deputy mayor I would I would like to look at that it's something we need to look at and and [unclear] council members remarks about the county and i'm not beating up on them but they give us we'll come back and say well you owe us 1.4 million for us to go further on this or to give us a time frame just kind of out of nowhere and i know our city manager just had a few conversations he might want to clarify anything i said i'm trying to make it uh confusing but is that kind of where we're at or we just kind of they come up with it and we don't even have chance to really talk about it or find much out about it well that's something that yes is a current conversation and what you're all referring to is
1:39:16 City Manager John Hohman
what the county's changing the records management system it's actually not the county changing in city of Spokane okay it's not providing that service anymore so the county has been forced to try to find a different approach I think what I'm hearing though you say and it could be a multiple part item which would be the first focus on the existing interlocal agreement we have with Spokane County that review is in the in the time frame that we can have that and maybe have that discussion with you all about bringing back some MODIFICATIONS THAT WOULD HOPEFULLY get to the point where you have feel more control. Councilmember Merkel talks a lot about metrics and maybe those can be weaved in to that interlocal as well. The other option that staff can look at if the council is, if that's the direction you want to go at, is options for not working with the county anymore and doing our own police force. So maybe you can provide me some clarity on what exactly you're looking for. There's a range of options, starting with the contract itself and recommending recommendations, and then there's another option of looking at alternatives. So just provide me some clarity and let me know where you want to go.
1:40:51 Councilmember Jessica Yaeger
And I apologize for my misspeaking on the county, city of Spokane thing, but for me, it comes down to what are we writing checks for, and do we have any say in what's happening?
1:41:10 Mayor Pam Haley
Council Member Higgins?
1:41:15 Councilmember Rod Higgins
Okay. I suspect that this is going to arrive at that array that we're talking about, the options, the list of options that we would eventually come up to, something that's missing from this, however, is if the rumors that seem to abound out there have any substance at all, we need to know where the county is at on this. Right now we're looking at it from our standpoint, and you know where I stand on that, so is there any way that we might also add to that list of investigation exactly, or perhaps we could even nudge the county a bit to talk to us to see if there's any substance to those rumors that they want to get rid of us, by the way. I don't want to be coy about this. I want to know whether or not they are comfortable the way things are looking.
1:42:20 City Manager John Hohman
Well, if I may, I do spend quite a bit of time on this subject. I just recently had lunch with [unclear] knolls in my conversations with the sheriff and with police chief ellis the sheriff's department does want to continue the relationship and they do believe that they provide a solid service at a very reasonable price and i think we can all agree that that is absolutely the truth our citizens are very happy with the service that they've received you have made an [unclear] a huge commitment to adding additional staff, which has placed a significant burden on us as an entity collectively and on this community to be able to pay for those services. But as you know, this is important to the community or else they wouldn't have passed the public safety sales tax measure. So this is one of those things, as we were talking earlier about the city hall improvements, is that the environment has changed. And especially, you know, during and after the pandemic, I think this region has changed quite a bit. And safety is a concern on everybody's mind. And so I think there's a couple of different things to your comments, Councilmember Higgins, is that I think from the service providers themselves that, yes, there is a commitment and a desire to continue the relationship and to work on those affordability issues. And I did talk to the sheriff about that and telling him that that would be a big concern for the council moving forward. We've had at least two years during the budget cycle here in 2025 and 2026 where this was foremost on your agenda of working through how do you look at sustaining this into the future? because we're talking about, particularly for 2026, having almost 12% increase in public safety costs, whereas the rest of the operational departments are coming in at 1.3% or a little under 1.3%. So we are, on our end, controlling those costs to the greatest degree that we can, but there is very little control over that on these contracts and these big contracts. So when you talk about 11% increase or almost 12% increase on, you know, a $34 or $35 million contract, that's a lot of money as opposed to, you know, 1.27 percent on 35 percent of your budget as opposed to 12 percent on 65 percent. So the numbers are pretty dramatic. As you know, we've talked about this a lot. Costs have increased annually on public safety over $16 million over the last five years. And that's every year. That's what you guys are paying. And, yes, some of that is due to the added staff, the added 20-plus, 23-ish staff that you've brought on. So I think the other question to that is beyond the service providers themselves, I'm really not certain where the commissioners are at. I think they do support this. That's what my understanding is in talking to a few of them individually. But I think you also have the administrative part of the county that is concerned about liability. And that's a big issue, too, that if you choose to go out on on our own with our own police force, that brings liability onto the city right now, which is squarely in the county's lap at the moment. Although that seems to get blurred a little bit with some of the lawsuits that we've been served recently. And then the risk pool increases as well. So every time the county gets sued, their costs go up to supply insurance for these types of things, and then that gets passed along. So the one thing I can say in my conversation with the sheriff, he was alluding to, and forgive me if I'm wrong on the dollar figures, but the county's share of the operation is about $28 million. We're at $35 million. [unclear] the difference would be the indirect or overhead rates from the county. And so there's a very complicated manner. And instead of maybe debating it all tonight, it would be just to look at starting on a review of the contract and then taking it from there wherever you want to go.
1:47:14 Councilmember Jessica Yaeger
Council Member Yeager? I think that's what I was kind of insinuating with having these four roundtable discussions per year is these kinds of things because this is not like a two-minute snippet kind of a thing but my my goal is if i'm going to look at my constituents in the eye i want to be able to show them and tell them that we have a budget that we know we have a handle on and right now i just feel like we write checks for very good service but when i saw a couple months ago, this $175,000 that was just on our thing that went to the look back two years ago thing. There was no explanation for it. It's just $175,000 gone.
1:48:04 Unidentified speaker [?]
Settle and adjust. Thank you.
1:48:07 Councilmember Jessica Yaeger
And I just feel like we're just sending money away of theirs. And that bothers me. So I think more conversations is what I think we need to have over the hows and the whys and and making sure that we're giving our citizens uh that they know that we have a handle on some of this especially the indirect costs and such so that's kind of what i'm trying to look for councilmember
1:48:35 Councilmember Ben Wick
wick yeah i mean i think we always especially since how it's such a large percentage of our budget and our biggest contract we definitely have to continue to keep an eye on it. I think we've done some pretty good progress of establishing a public safety committee this year for the first time. I think that was, I didn't realize how big of a step that was, but it really has been very beneficial for us. I agree that we need to continue to look for ways to kind of control costs, but I think we need to be prudent about doing that. And so whether it's reviewing our contract, and I just want to highlight, I know that we have a provision in our contract about they're supposed to come to get our approval for anything that's going to cost more than $300,000. But as we look at changes to the contract or something of that nature, I think that maybe that's something that we need a little bit more discussion around to see how that works. Or as we started paying for assets up front, I think maybe the disposition of those assets or something of that nature needs to come back around. So I think that we need to have more conversations around this.
1:49:43 Mayor Pam Haley
yeah I agree we need to have conversations around the contract my issue is that and I am gonna use the county in vain here they do things like buy a new software system that's way over $300,000 and we don't even know it's happening and they approve it. That can't happen. It just can't. We need to be able to know why, what, how much. [P1: So] all those things i agree i think we need to look at the contract with the county and look into what we actually are paying for in those costs that get added on two years after we're supposed to pay for them so there's a couple questions here so consensus to bring forward to talking about the contract itself not with the sheriff's department with the county and
1:50:42 Mayor Pam Haley
then do you want [P1: to look] do you want to start with there or do you want to yeah we're gonna start there okay let's do that we'll start there
1:50:51 Councilmember Ben Wick
okay okay got it perfect next up is councilmember reports councilmember wick you know given the time of year I'll just keep a brief at the Association of Cities conference or board meeting there's troubled times across all cities some cities are having some pretty good significant budget cuts for the first time in a number of years the city of yakima is actually not renewing its membership in the association of cities and so hopefully they will come back as their budget conditions kind of reassess they went with a voter approved levy lift that was not supported by the voters in november so they had to do some pretty drastic cuts to their budget [P1: Also] they had the city officials elected official essentials class there were over 400 elected officials from cities in the essentials class which is one of their biggest classes they've had one other thing to highlight from that was there was over 100 150 new city council members that won their election that beat out incumbents so not only is there a significant change in the number or significant turnover in city officials. There's also a significant changeover in city officials that were not by choice. So the voters chose to go down a different path. So there's a big learning curve in cities across the state. I don't remember if I mentioned here or not, but kind of heart goes out to the city of Cheney, who has a new mayor, as well as a city administrator who has moved on, a budget manager [P1: a chief] of police and the public works director all at the same time here at the end of the year so if we hear about cheney or hear from somebody from genie we just offer a little bit of assistance there if we hear from our friends in cheney washington and that's all i have
1:52:52 Councilmember Rod Higgins
council member higgins thank you let me start by wishing everyone a very merry christmas and a happy new year [P1: and] as I exit let me say that first of all thank you everyone here for the interest you show in city government it's your government and you should be here more often actually and let me end by by saying it's [unclear] my [unclear] I'll get through this it's been my absolute honor and pleasure to serve with a staff that I believe is second to absolutely none
1:53:55 Mayor Pam Haley [attribution disputed across passes]
thank you all that's all I have council member Yeager I'm someone that likes to cry when other people's cry. So.
1:54:07 Councilmember Jessica Yaeger
Between travel and maybe missing a meeting or something, I have a lot of here, a lot of stuff that I haven't reported on, but really the most recent was the Opioid Task Force. There's lots of stuff going around the region here with people and what they're doing. And the thing that would probably hit the most is Spokane County here. And it sounds like there's going to be some breaking ground of the new facility in January. And I take so many notes during this meeting. So if it doesn't come across right, I apologize because people speak fast and I'm trying to type just as fast. And I think it's called a Path and Recovery Center or the Path Center. So they're calling it something a little bit more cheery, I guess. And then STARS is working on the van going further out for transport into the areas. And that's about all I have. But I just want to say Merry Christmas, too. And thank you so much again to Rod for his service here.
1:55:13 Deputy Mayor Tim Hattenburg
Happy New Year, Mayor Hattenberg. You know, I have a lot of STA information that I'll save till January. It's not really going to change that much and probably be more updated. But I do want to share with you and some of you may be aware of the LDS community, church [P1: and community] there's vending machines at the Valley Mall, they're called Light Up the World Giving Machines and they have five local non-profits that they chose Vanessa Behan Crisis, Snap [unclear] Closet, Project Beauty supply and second harvest and also they were they're available through january 2nd and there's a price range of anywhere from five to a hundred dollars and up they we were there at the it was rare to ribbon cutting they actually had people and a young gal athlete uh pointed out who had lost her leg in an accident they said she's the fastest fastest woman with one knee as they said And she's no, she was in the Paralympics, I believe. And so she gave a very, very nice introduction in how that works and affects people worldwide. And there's only 26 cities in the world that have these. We are now the 27th one. They chose the valley. And I want to give special thanks to Keith and Shelly Clark for sharing this information with us at a previous city council meeting. So if you get a chance for January 2nd, I'd like to just take a look at it. And there's literally, I can't wait to find the numbers of the thousands of dollars that are going to be raised that will come back to our community. And that's all I have.
1:56:38 Mayor Pam Haley
Thank you. Yeah, that was pretty impressive. They also had the Crosby family there singing. And I'm telling you, their 13-year-old daughter's voice gave me chills. She has, like, a perfect pitch. It's insane how good she is. So if you get a chance to see them, they do a lot of concerts at churches and things like that. [unclear] if you get a chance to see him please do and because this is Christmas I'm just gonna say Merry Christmas to everybody and I'd like to tell Council [unclear] Higgins that the honor has been mine to work with you and to say I'm gonna miss you is not even close to how I feel so and plus I'm gonna have to bring my own binders, which is a major bummer. City manager comments.
1:57:29 City Manager John Hohman
Thank you Mayor Haley, council members. I wanted to start off and maybe have the council debate this just a little bit, but as you know the Association of Washington Cities has the Center for Quality Community Scholarship that we're actively taking applications for right now, but we need probably a little more clarity on the process for how you want to move forward with those and so I know councilmember Wick has offered to help organize that and I think when you discussed it at the council level last you just we're looking for an open process well we have it on our website it's it's an open process book how do you want
1:58:13 Councilmember Ben Wick [attribution disputed across passes]
to receive those and select those moving forward so I thought maybe you just take a few moments to work through that and councilmember Wick if [unclear] had anything to add no just trying to make sure that we're all on the same page so there's no surprises [unclear] i just think and i'm i appreciate the fact that council member work is wanting to do this and also work with our website and if you want to coordinate that i'd be fine with that so do you want to do we want to do an interview panel to talk to some of these kids as they go through to review applications [P1: I] know it's a tight turnaround january 9th is when the applications are due and we're looking for a decision on the 20th so you'd have to be available between the 9th and the 20th right that's true the 9th and whatever the thursday before the 20th is yeah
1:59:07 Mayor Pam Haley
thoughts from anyone thoughts
1:59:14 Mayor Pam Haley
any thoughts on i mean i'm perfectly willing to help interview but I'm also perfectly willing to have you [unclear] you some names make it work
1:59:28 Councilmember Ben Wick
I'd be really happy if you made it work okay okay I can do that unless I just want to give anybody else an opportunity if you wanted to be a part of that review process that you can you'd like to be okay I can help you okay I just want to make sure that we stay below a quorum so yeah yeah okay okay thank you And
1:59:48 City Manager John Hohman
then finally tonight, I do want to pile on to Rod Higgins, wishing him a farewell. I started working with Rod in 2011 when he was on the Planning Commission and then a lot of people probably don't remember this but he got on the City Council by a coin toss and we still have that coin somewhere here we don't I do oh you
2:00:20 Councilmember Rod Higgins
took it back huh see we need security upgrades here I for the occasion I had at this spokesman's article and the coin and I forget what else anyway was all framed and one day I when we moved into the new building here it was shoved back in a corner and I said hey you're not going to use that can I have it he said by all means take it so I did like I said we need security [unclear] you want it back no but the
2:01:00 City Manager John Hohman
point being is that Rod you've spent a tremendous amount of time committed to this community and as part of being up there on the dais [P1: I] think it's very easy to go week to week and criticize everything and tear things apart very hard to build and it's even harder to make difficult decisions that you know are going to be controversial and are going to guarantee to upset a large portion of the community but one that you feel is important enough to take action on and you've been one of those council [P1: council members] over the years that have never were afraid of doing what you thought you was the best for the community and I just had this conversation with our incoming council member earlier today about this is an interesting business because you're guaranteed to make people upset no matter what you do and I had a conversation with another constituent over the summer about how difficult this can be and how [unclear] my philosophy is if if you're not making at least some of the population angry with what you do it's probably means you're not doing your job so if everybody's happy with everything you're doing you're you're not making those difficult decisions you're not taking the city in the direction that you want i want to thank you for being a mayor you've you've held that role [unclear] also have held the deputy mayor role we spent a lot of time in 2016 all the council members that were on the council members on the council in 2015 and 2016 remember how much time you spent on the comprehensive plan and working through all that countless hours spent talking about zoning maps and individual parcels and how do we incentivize development where we want it and try to restrict it from those areas that we don't? And how do we create an economic development program that results in the successes that we've seen to date? You were part of those initial discussions way back when and have been instrumental in bringing a lot of those proposals forward. For instance, the Northeast Industrial Area, you were a big supporter of that and were behind all the different decision points to reconstruct the infrastructure to work with Spokane County to extend the sewer whenever we worked on a road, really set the table for the development that has occurred out there. And where we thought it was going to be a 10-year build-out, it was a three-year sales, a fire sale. Everybody bought everything out there real quick. That's why we need to expand to the east. So I just want to conclude that from, and I speak on behalf of the staff, they have really appreciated your steadfast support of them and the relationship that you chose to create with every one of them. So thank you for that, and thank you for your service.
2:04:33 City Manager John Hohman
And finally, Merry Christmas to everybody. And that's it. Move to adjourn.
2:04:38 Mayor Pam Haley
Second. All those in favor? Aye. Opposed? We are adjourned, everybody. Thank you. ---